kw.\*:("TRANSPORT PIPELINE")
Results 1 to 25 of 951
Selection :
AUTOMATISIERUNG DER DISPATCHING BEI PIPELINE-PROJEKTEN = AUTOMATISATION DU DISPATCHING DANS LES PROJETS DE PIPE-LINESKOSSMANN D.1974; IN: COMPEND. 74/75. VORTR. 24. HAUPTTAG. DTSCH. GES. MINERALOELWISS. KOHLECHEM.; HAMBURG; 1974; LEINFELDEN; INDUSTRIEVERLAG VON HERNHAUSSEN; DA. 1974; VOL. 2; PP. 830-843; ABS. ANGLConference Paper
PIPELINE EQUIPMENT COST INDEX (1947-100) = INDICE DES COUTS D'EQUIPEMENT DE PIPELINES (BASE 100 EN 1947)1974; OIL GAS J.; U.S.A.; DA. 1974; VOL. 72; NO 32; PP. 80Article
WORLD-WIDE CONSTRUCTION SCOREBOARD = ETAT DES CONSTRUCTIONS EN COURS DANS LE MONDE1974; PIPE LINE INDUSTRY; U.S.A.; DA. 1974; VOL. 41; NO 1; PP. 63-72Article
PIPELINE CONSTRUCTION = CONSTRUCTION DE PIPELINE1973; PETROLEUM PETROCHEM. INTERNATION.; G.B.; DA. 1973; VOL. 13; NO 1; PP. 59-83 (5 P.)Serial Issue
PIPE LINE NEWS EQUIVALENT VALVE TABLE SECTION. CAST STEEL VALVES A FORGED STEEL VALVES A PIPELINE GATE VALVES = SECTION SUR LES TABLEAUX D'EQUIVALENCE DE VANNES DE "PIPE LINE NEWS". VANNES EN ACIER MOULE - VANNES EN ACIER FORGE - VANNES A PASSAGE DIRECT1974; PIPE LINE NEWS; U.S.A.; DA. 1974; VOL. 46; NO 9 SUPP; PP. 48-69 (21 P.)Article
STRUCTURAL DESIGN OF PIPE LINES SUBJECT TO TEMPERATURE CHANGE = CONCEPTION STRUCTURELLE DES PIPELINES EXPOSES A DES VARIATIONS DE TEMPERATUREFEKETE LA.1974; PIPE LINE INDUSTRY; U.S.A.; DA. 1974; VOL. 41; NO 2; PP. 57-59; BIBL. 4 REF.Article
OU VA L'INDUSTRIE DU PIPELINE1974; PETROLE INFORM., REV. PETROL.; FR.; DA. 1974; NO 1331; PP. 27-50 (2 P.)Article
DETERMINATION DES PARAMETRES FONDAMENTAUX DES SERVICES D'ENTRETIEN DE LA PRODUCTION D'UN PIPE-LINE PETROLIERRASHCHEPKIN KE; GRIGOR'EVA NV; SAMOJLOV VV et al.1974; TRANSP. KHRAN. NEFTI NETEPROD.; S.S.S.R.; DA. 1974; NO 7; PP. 7-9; BIBL. 3 REF.Article
RESULTS OF TGT RESEARCH ON COATINGS FOR THE ARCTIC = RESULTATS DU PROGRAMME DE RECHERCHE TGT SUR LES REVETEMENTS DESTINES A L'ARCTIQUECHOATE LC.1975; PIPE LINE INDUSTRY; U.S.A.; DA. 1975; VOL. 42; NO 3; PP. 39-42 (3 P.)Article
WORLD-WIDE CONSTRUCTION SCOREBOARD = ETAT DES CONSTRUCTIONS EN COURS DANS LE MONDE1974; PIPE LINE INDUSTRY; U.S.A.; DA. 1974; VOL. 41; NO 4; PP. 67-76Article
CONCERNE L'EMPLOI DE L'AVIATION POUR LA CENTRALISATION DU SERVICE (ENTRETIEN) DES CANALISATIONS PRINCIPALES PETROLIERESVEKSHTEJN MG; TUGUNOV PI; GALEEV VB et al.1974; TRANSP. KHRAN. NEFTI NEFTEPROD.; S.S.S.R.; DA. 1974; NO 4; PP. 16-18; BIBL. 2 REF.Article
INFLUENCE DES DEFAUTS DE SOUDURE SUR L'EXPLOITATION DES PIPELINESPARAZS B.1973; BANYASZ. KOHASZ. LAPOK, KOEOLAJ FOELDGAZ; MAGYAR.; DA. 1973; VOL. 6; NO 2; PP. 48-51; BIBL. 10 REF.Serial Issue
WORLDWIDE CONSTRUCTION. PIPELINES = CONSTRUCTIONS EN COURS DANS LE MONDE. PIPELINES1975; OIL GAS J.; U.S.A.; DA. 1975; VOL. 73; NO NO 16; PP. 128-136 (5 P.)Article
STANDARD APPLIED PIPE COATING WEIGHTS FOR NAPCA COATING SPECIFICATIONS = STANDARDS DE POIDS DES REVETEMENTS APPLIQUES SUR LES TUBES POUR LES SPECIFICATIONS NAPCA DE REVETEMENTS1974; PIPE LINE NEWS; U.S.A.; DA. 1974; VOL. 46; NO 9 SUPPL; PP. 10-12 (2 P.)Article
THE FAILURE BEHAVIOUR OF LINE PIPE DEFECTSSHANNON RWE.1974; PRESS. VESSELS PIPG; G.B.; DA. 1974; VOL. 2; NO 4; PP. 243-255; BIBL. 8 REF.Article
RANGELAND INTRODUCES NEW AUTOMATION/CONTROL SYSTEM = RANGELAND INTRODUIT DE NOUVEAUX CONCEPTS DE CONTROLE ET D'AUTOMATISATION1975; PIPE LINE INDUSTRY; U.S.A.; DA. 1975; VOL. 42; NO 4; PP. 43-44Article
COMPLETED COSTS, PIPELINES = COUTS DES PIPELINES TERMINES1974; OIL GAS J.; U.S.A.; DA. 1974; VOL. 72; NO 32; PP. 75-76Article
BREVET 2.237.195 (B) (7423826). A 9 JUILLET 1974. SYSTEME ELECTRIQUE POUR APPAREIL DE MESURE DE LA DENSITE D'UN MELANGE ACHEMINE PAR PIPE-LINEsdPatent
EQUIPEMENT CARE AND MAINTENANCE IN ARCTIC ENVIRONMENTS = LES SOINS A APPORTER A L'EQUIPEMENT ET SON ENTRETIEN DANS UN ENVIRONNEMENT ARCTIQUE1975; PIPELINE GAS J.; U.S.A.; DA. 1975; VOL. 202; NO NO 5; PP. 36-39 (2 P.)Article
HOW TO PROTECT OFFSHORE PIPE LINES = COMMENT PROTEGER LES PIPELINES EN MERBROWN RJ.1975; PIPE LINE INDUSTRY; U.S.A.; DA. 1975; VOL. 42; NO 3; PP. 43-47 (4 P.)Article
INTERPROVINCIAL PROJECT GETS BACKING = LE PROJET "INTERPROVINCIAL" REFAIT SURFACE1975; OIL GAS J.; U.S.A.; DA. 1975; VOL. 73; NO 2; PP. 18Article
DAS MESSEN DER ROHRWANDTEMPERATUREN BEI DER DICHTHEITSPRUEFUNG VON ROHRLEITUNGEN NACH VDTUV-MERKBLATT 1051 = MESURE DES TEMPERATURES DES PAROIS DE TUBES LORS DE LA VERIFICATION DE L'ETANCHEITE DES CONDUITES SELON LE PROCEDE DU VDTUV. FEUILLE DE RENSEIGNEMENT 1051TIEDTKE R.1975; T.U.; DTSCH.; DA. 1975; VOL. 16; NO 1; PP. 15-17; BIBL. 5 REF.Article
SEMI-SUBMERSIBLE PIPELAYER "CASTORO VI" IS SOMETHING NEW. READY FOR ACTION NEXT YEAR1975; NORTH. OFFSHORE; NORWAY; DA. 1975; VOL. 4; NO 4; PP. 28-30 (2 P.)Article
SPHERING IS USED IN TWO-PHASE OFFSHORE PIPELINE = DES SPHERES SONT UTILISEES POUR DES PIPELINES EN MER A ECOULEMENT BIPHASIQUEPURGATORIO BR JR.1975; OIL GAS J.; U.S.A.; DA. 1975; VOL. 73; NO 12; PP. 5660Article
TRANS-ALASKA SCHEDULED FOR SPRING PIPELAY START = LA POSE DES CONDUITES DU PIPELINE TRANS-ALASKA DOIT DEBUTER AU PRINTEMPSDEASON D.1975; PIPE LINE INDUSTRY; U.S.A.; DA. 1975; VOL. 42; PP. 28-32Article