Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("TURBOGENERATOR")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 1185

  • Page / 48
Export

Selection :

  • and

COMBINED SUBOPTIMAL EXCIATION CONTROL AND GOVERNING OF A.C. TURBOGENERATORS USING DYNAMIC SENSITIVITY ANALYSIS.DANIELS AR; LEE YB; PAL MK et al.1977; PROC. INSTIT. ELECTR. ENGRS; G.B.; DA. 1977; VOL. 124; NO 5; PP. 473-478; BIBL. 18 REF.Article

THE VIBRATION CHARACTERISTICS OF A 500 MW TURBINE UNIT.RUNOV BT; KOVAL GS; SALMON AV et al.1977; SOVIET POWER ENGNG; U.S.A.; DA. 1977; VOL. 6; NO 6; PP. 345-348Article

CHANGES IN THE INVESTIGATION AND SELECTION OF SITES FOR NUCLEAR POWER STATIONSGAMMON KM; PEDGRIFF GF.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 1; PP. 41-45; BIBL. 5 REF.Article

TWENTY YEARS LATER: A SECOND NUCLEAR ERAWEINBERG AM.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 1; PP. 18-20Article

FORTSCHRITTE DER INGENIEURVERMESSUNG BEI KRAFTWERKEN = PROGRESS IN POWER PLANT ENGINEERING MEASUREMENTS = PROGRES REALISES DANS LES METHODES DE MESURES DANS LES CENTRALESZAK M.1981; VGB KRAFTWERKSTECH.; ISSN 0372-5715; DEU; DA. 1981; VOL. 61; NO 5; PP. 408-412; ABS. DAN/FIN/FRE/DUT/ITA/SWE; BIBL. 2 REF.Article

CIVIL ENGINEERING AND NUCLEAR ENERGYHANNAH IW.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 1; PP. 37-40; BIBL. 1 REF.Article

RESEARCH IN NUCLEAR ENERGYCURRAN S.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 1; PP. 24-27; BIBL. 1 REF.Article

OVER RUNNING CLUTCH FOR SYNCHRONOUS OPERATION OF A GAS TURBINE GENERATORKIMURA S; MURAYAMA T; OHI M et al.1981; HITACHI REV.; ISSN 0018-277X; JPN; DA. 1981; VOL. 30; NO 6; PP. 313-318Article

Lamme on a revolution in electric power generatorsBRITTAIN, J. E; LAMME, G.Proceedings of the IEEE. 1984, Vol 72, Num 4, pp 493-526, issn 0018-9219Article

COMPONENT CLASSIFICATION IN TURBINE-GENERATOR MANUFACTUREBUTZBACH D.1983; NUCLEAR ENGINEERING INTERNATIONAL; ISSN 0029-5507; GBR; DA. 1983; VOL. 28; NO 337; PP. 42-45Article

FORT ST VRAIN EXPERIENCEBREY HL; OLSON HG.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 2; PP. 117-121; BIBL. 7 REF.Article

LIGHT WATER REACTOR ACCIDENTS: IS THERE REALLY A MAJOR PUBLIC RISK.LEVENSON M.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 2; PP. 75-82; BIBL. 1 REF.Article

NUCLEAR ENERGY: 20 YEARS ONSHERFIELD.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 1; PP. 15-17; BIBL. 1 REF.Article

INFLUENCE DES PARTICULARITES DE LA CONSTRUCTION DU SYSTEME DE RECHAUFFEMENT DES BRIDES SUR L'ETAT THERMIQUE ET DE CONTRAINTE DU CORPS DU CYLINDRE DE HAUTE PRESSION DE LA TURBINE K-160-130 XTG3BERLYAND VI; GUTOROV VF; LEVIT IG et al.1982; TEPLOENERGETIKA (MOSKV., 1954); ISSN 0040-3636; SUN; DA. 1982; NO 1; PP. 39-44; BIBL. 7 REF.Article

LARGE SCALE TEST FACILITIES TO ASSURE FUTURE TURBINE-GENERATOR RELIABILITY.QUICK SL.1976; NUCL. ENGNG INTERNATION.; G.B.; DA. 1976; VOL. 21; NO 249; PP. 59-60Article

GROUPES ELECTROGENES A TURBINE A GAZ1979; MAINTENANCE; FRA; DA. 1979; NO 97; PP. 36Article

Cogenerazione con centrali turbogas = Remarks as to the systems chosen and their performancesCOLI, G.Installatore italiano. 1996, Vol 47, Num 3, pp 467-474, issn 0020-2118, 10 p.Article

Expérience d'exploitation du premier turbogénérateur de 1200 MW-3000 tr/mnKHUTORETSKIJ, G. M; DANILEVICH, YA. B.Èlektrotehnika (Moskva, 1963). 1984, Num 10, pp 11-12, issn 0013-5860Article

Turbogénérateurs de série normalisée de 63 et 110 MW-3000 tr/mnGLEBOV, I. A; ANDREEV, A. V; VERKHOTUROV, YU. E et al.Èlektrotehnika (Moskva, 1963). 1984, Num 10, pp 2-4, issn 0013-5860Article

Wuchttechnik an Turbosätzen = Technique d'équilibrage des turbo-alternateursD'HAM, R.VGB Kraftwerkstechnik. 1983, Vol 63, Num 11, pp 951-957, issn 0372-5715Article

The vibratory surveillance of the turbogenerator sets at Electricite de FranceFANTON, J. P.On-line monitoring of continuous process plants. International conference. 1983, pp 269-280Conference Paper

MECHANICAL CASING REPAIRS EXTEND LIFE OF OLD T-6SPAPAMARCOS J.1983; POWER ENGINEERING (BARRINGTON, ILL.); ISSN 0032-5961; USA; DA. 1983; VOL. 87; NO 3; PP. 55-57Article

METHODE DE CALCUL DES NORMES DES DECENTRAGES DE LA LIGNE D'ARBRES LORS DU PROJET DES TURBINESFRAKIJSKIJ GA.1982; ENERGO-MASHINOSTR.; SUN; DA. 1982; NO 3; PP. 13-15; BIBL. 5 REF.Article

DEVELOPPEMENT DU SYSTEME SSG. (SUPER ECONOMIQUE DE GENERATEUR D'ARBRE)1981; ISHIKAWAJIMA-HARIMA GIHO; ISSN 0578-7904; JPN; DA. 1981; VOL. 21; NO 6; PP. 534-540; ABS. ENGArticle

NEW LIFE AVAILABLE FOR OLD T/GS AND BOILERSFRIEDLANDER GD.1983; ELECTRICAL WORLD; ISSN 0013-4457; USA; DA. 1983; VOL. 197; NO 5; PP. 87-96Article

  • Page / 48