Alternative for quantifying field-overhead damages

Author
IBBS, William1 ; NGUYEN, Long D1
[1] Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, CA 94720, United States
Source

Journal of construction engineering and management. 2007, Vol 133, Num 10, pp 736-742, 7 p ; ref : 1/2 p

CODEN
JCEMD4
ISSN
0733-9364
Scientific domain
Civil engineering
Publisher
American Society of Civil Engineers, Reston, VA
Publication country
United States
Document type
Article
Language
English
Author keyword
Claims Cost analysis Damage Delay time Scheduling
Keyword (fr)
Analyse dommage Analyse quantitative Etude cas Gestion projet Industrie construction Ordonnancement Planification Responsabilité Temps retard
Keyword (en)
Failure analysis Quantitative analysis Case study Project management Construction industry Scheduling Planning Responsibility Delay time
Keyword (es)
Análisis avería Análisis cuantitativo Estudio caso Gestión proyecto Industria construcción Reglamento Planificación Responsabilidad Tiempo retardo
Classification
Pascal
001 Exact sciences and technology / 001D Applied sciences / 001D14 Buildings. Public works / 001D14A General / 001D14A01 Project management. Process of design

Discipline
Building. Public works. Transport. Civil engineering
Origin
Inist-CNRS
Database
PASCAL
INIST identifier
19136056

Sauf mention contraire ci-dessus, le contenu de cette notice bibliographique peut être utilisé dans le cadre d’une licence CC BY 4.0 Inist-CNRS / Unless otherwise stated above, the content of this bibliographic record may be used under a CC BY 4.0 licence by Inist-CNRS / A menos que se haya señalado antes, el contenido de este registro bibliográfico puede ser utilizado al amparo de una licencia CC BY 4.0 Inist-CNRS

Access to the document

Searching the Web