Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("Lovat")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 10 of 10

  • Page / 1
Export

Selection :

  • and

Views from the siteO'REILLY, H.Tunnels & tunnelling. 1986, Vol 18, Num 7, pp 50-51, issn 0041-414XArticle

The occupation history of the region between the Dvina and Lovat Rivers in relation to the dynamics of environmental changeZAITSEVA, G. I; MIKLIAEV, A. M; MAZURKEVICH, A. N et al.Radiocarbon. 1995, Vol 37, Num 2, pp 251-257, issn 0033-8222Conference Paper

Free flow for Hamburg's deep sever siphonWALLIS, S.Tunnels & tunnelling. 1986, Vol 18, Num 4, pp 35-38, issn 0041-414XArticle

Thames water ring main-feared up to slice through London and beyondWALLIS, S.Tunnels & tunnelling. 1990, Vol 22, Num 12, pp 43-45, issn 0041-414X, 3 p.Article

TBM protected in drive through gassy ground = Tunnelier protégé au cours du forage en terrain grisouteuxTunnels & tunnelling. 1988, Vol 20, Num 6, issn 0041-414X, 47Article

PARTICULARITES DE FORMATION DU RELIEF DANS DES ZONES GLACIAIRES (D'APRES L'EXEMPLE DE LA REGION DE LA CALOTTE DE LA DERNIERE GLACIATION DE LOVATFAUSTOVA MA.1973; IZVEST. AKAD. NAUK S.S.S.R., SER. GEOGR.; S.S.S.R.; 1973, NUM. 0004, P. 102 A 111Serial Issue

Houston Northside relief Sewer: TBM in lost contract rescue = L'égout nord de Houston: un tunnelier au secours d'un contrat perduWALLIS, S.Tunnels & tunnelling. 1988, Vol 20, Num 7, pp 25-26, issn 0041-414XArticle

Washington metro: jet grouting the key to Navy Yard east success = Métro de Washington: le jet grouting clé du succès à Navy Yard estMARTIN, D.Tunnels & tunnelling. 1989, Vol 21, Num 3, pp 35-37, issn 0041-414XArticle

Triple TBM drive puts Austin interceptor into top gear = Trois tunneliers pour l'égout d'AustinMARTIN, D.Tunnels & tunnelling. 1987, Vol 19, Num 10, pp 24-26, issn 0041-414XArticle

Caracas metro: soft ground TBMs set a cracking pace in Caracas = Métro de Caracas: Des tunneliers pour terrain meuble onf fait un pas décisif à CaracasWALLIS, S.Tunnels & tunnelling. 1988, Vol 20, Num 9, pp 25-28, issn 0041-414XArticle

  • Page / 1