Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("PIPELINES")

Filter

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 24074

  • Page / 963
Export

Selection :

  • and

FINANCING INTERNATIONAL LINE CONTRACTSHALL MS.1981; PIPE LINE IND.; ISSN 0032-0145; USA; DA. 1981; VOL. 54; NO 1; PP. 41-44; 3 P.Article

PIPELINE-PLUGGING METHODS KEEP PACE WITH INDUSTRY NEEDSPICKELL MB; WILLIAMSON TD.1980; OIL GAS J.; USA; DA. 1980; VOL. 78; NO 9; PP. 47-51; BIBL. 10 REF.Article

COLONIAL APPLIES MICROCOMPUTER TO LINE METERINGLABERGE RN; CRIDER C.1978; OIL GAS J.; USA; DA. 1978; VOL. 76; NO 51; PP. 64-67Article

CRITERIA SET FOR PIPELINE REPAIR.KIEFNER JF.1978; OIL GAS J.; USA; DA. 1978; VOL. 76; NO 32; 104-117 (7 P.); BIBL. 11 REF.Article

THE OUTLOOK FOR LIQUID PIPELINES IN 1977.LUFFMAN H.sdIN: INTERPIPE 77. INT. PIPELINE TECHNOL. CONV. 5. EXHIB. CONF.; HOUSTON, TEX.; 1977; S.L.; DA. S.D.; PP. 28-40Conference Paper

THREE 10-MILE-LONG SUBMARINE PIPELINES OFF CALIFORNIA SHORE ARE LAID SIMULTANEOUSLY = POSE SIMULTANEE DE 3 PIPELINES SOUS-MARINS DE 10 MILLES DE LONG AU LARGE DE LA CALIFORNIEMCGRAW RE.1982; OIL GAS J.; ISSN 0030-1388; USA; DA. 1982; VOL. 80; NO 27; PP. 114-119; 2 P.Article

LA TECHNOLOGIE FUTURE DES PIPELINES = FUTURE TECHNOLOGY OF PIPELINESDE SIVRY B.1981; PETR. INF. (1969); ISSN 0150-6463; FRA; DA. 1981; NO 1557; PP. 34-36Article

PIPELAYING BARGE TO SWITCH ROLESRINTOUL B.1980; DRILL. CONTRACT.; ISSN 0046-0702; USA; DA. 1980; VOL. 36; NO 11; PP. 47-50; 2 P.Article

SAIPEM: THE LESSONS OF MESSINA1980; PETROLE INFORM., REV. PETROL.; FRA; DA. 1980; VOL. 1530; PP. 32-43; 7 P.Article

SEPARATE AND HOLD SUBSEA PIPELINES AT CROSSINGS. REGAL DEVELOPS ALTERNATIVE TO SANDBAG BRIDGES.1978; DRILLG-D.C.W.; U.S.A.; DA. 1978; VOL. 39; NO 7; PP. 65Article

DOWN'TO THE ABYSSAL PLANE AND OTHER DARK PLACES.BYFORD AN.1977; IN: ENERGY IN 80S. SYMP. EUR. FED. CHEM. ENG. EVENT. 186; MIDDLESBOROUGH; 1977; RUGBY; INST. CHEM. ENG.; DA. 1977; PP. (40P.); BIBL. 5 REF.Conference Paper

RUSSIAN PIPELINING BOOM WILL CONTINUE INTO "80" S.AULDRIDGE L.1977; OIL GAS J.; U.S.A.; DA. 1977; VOL. 75; NO 42; PP. 107-116 (5P.)Article

HIGH ISLAND OFFSHORE SYSTEM'S PIPELINE NETWORK UNDER WAY IN GULF.EWING RC.1977; OIL GAS J.; U.S.A.; DA. 1977; VOL. 75; NO 2; PP. 91-103 (5P.)Article

RESECTION OF SUBMERGED PIPELINESKHOKHLOV IV.1978; TRANSP. KHRAN. NEFTI NEFTEPROD.; S.S.S.R.; DA. 1978; NO 4; PP. 7-9; BIBL. 5 REF.Article

NEW METHODS NEEDED FOR DEEPWATER PIPE-LAYING.BROWN RJ.1977; OIL GAS J.; U.S.A.; DA. 1977; VOL. 75; NO 36; PP. 58-61Article

PIPE LAID TO RECORD DEPTH OF 2000 FEET IN SICILY TRIALS. COMPLEX ENGINEERING PRECEDED SEA TRIALS.MATTEELLI R.1977; PIPELINE GAS J.; U.S.A.; DA. 1977; VOL. 204; NO 5; PP. 18-22 (4P.)Article

TENSOES EM OLEODUTOS DURANTE O LANCAMENTO EM AGUAS PROFUNDAS. = STRESSES OF OIL PIPES DURING LAYING IN DEEP WATERS = TENSION DES OLEODUCS DURANT LA POSE EN EAUX PROFONDESPRODONOFF V; MARTINS FERREIRA SM.1976; BOL. TEC. PETROBRAS.; BRAS.; DA. 1976; VOL. 19; NO 4; PP. 289-310; ABS. ANGL.; BIBL. 19 REF.Article

ROUGH WATER PIPELAYING.FREUND J.sdIN: INTERPIPE 77. INT. PIPELINE TECHNOL. CONV. 5. EXHIB. CONF.; HOUSTON, TEX.; 1977; S.L.; DA. S.D.; PP. 251-263Conference Paper

RECENT DEEP WATER PIPELAYING EXPERIENCES. RESULTS AND INDICATIONS.SILVESTRI A.sdIN: INTERPIPE 77. INT. PIPELINE TECHNOL. CONV. 5. EXHIB. CONF.; HOUSTON, TEX.; 1977; S.L.; DA. S.D.; PP. 70-86Conference Paper

PIPELINES EN MER, FABRICATION, POSE, ENSOUILLAGE = SEA PIPELINES, MANUFACTURING, LAYING, UNDERGROUND LAYINGLALLIER L; QUENELLE A.1980; CONGRES INTERNATIONAL GENIE CIVIL ET DEVELOPPEMENT ECONOMIQUE/1979/PARIS; FRA; MONTLIGEON: IMPR. MONTLIGEON; DA. 1980; VOL. 1; PP. 198-218Conference Paper

THE DEEP WATER CHALLENGE.1978; NORTH. OFFSHORE; NORWAY; DA. 1978; VOL. 7; NO 1; PP. 22-28 (6P.)Article

PROBLEM CONCERNING HEATING OF DIVER UNDER WATERKARPINOS DM; STOLIN RM; IZMALKOV OM et al.1977; TRANSP. KHRAN. NEFTI NEFTEPROD.; S.S.S.R.; DA. 1977; NO 2; PP. 21-23; BIBL. 8 REF.Article

LAYING FLEXIBLE PIPELINES IN DEEP WATER.1976; OCEAN INDUSTRY; U.S.A.; DA. 1976; VOL. 11; NO 8; PP. 77-78Article

BREVET 2.338.444 (A1) (76 01100). - 16 JANVIER 1976. POSE DE CONDUITES SOUS-MARINES.sdPatent

AN ONBOARD COMPUTER PROGRAM FOR CONTROLLING THE PIPELAYING.WIIK T.1976; IN: AUTOM. OFFSHORE OIL FIELD OPER. IFAC-IFIP SYMP. PROC.: BERGEN, NORWAY; 1976; AMSTERDAM; NORTH-HOLLAND; DA. 1976; PP. 143-149; BIBL. 7 REF.Conference Paper

  • Page / 963