Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("Resource constraints")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 230

  • Page / 10
Export

Selection :

  • and

Inspection allocation planning for a multiple quality characteristic advanced manufacturing systemSHIAU, Y.-R.International journal, advanced manufacturing technology. 2003, Vol 21, Num 7, pp 494-500, issn 0268-3768, 7 p.Article

Experimental investigation of heuristics for resource-constrained project scheduling : An updateKOLISCH, Rainer; HARTMANN, Sönke.European journal of operational research. 2006, Vol 174, Num 1, pp 23-37, issn 0377-2217, 15 p.Article

A Survey of Resource Constrained Shortest Path Problems: Exact Solution ApproachesDI PUGLIA PUGLIESE, Luigi; GUERRIERO, Francesca.Networks (New York, NY). 2013, Vol 62, Num 3, pp 183-200, issn 0028-3045, 18 p.Article

Addressing capacity uncertainty in resource-constrained assignment problemsTOKTAS, Berkin; YEN, Joyce W; ZABINSKY, Zelda B et al.Computers & operations research. 2006, Vol 33, Num 3, pp 724-745, issn 0305-0548, 22 p.Article

How to integrate precedence constraints and shared resources in real-time schedulingSPURI, M; STANKOVIC, J. A.IEEE transactions on computers. 1994, Vol 43, Num 12, pp 1407-1412, issn 0018-9340Article

Quick decision-making support for inspection allocation planning with rapidly changing customer requirementsSHIAU, Yau-Ren.International journal, advanced manufacturing technology. 2003, Vol 22, Num 9-10, pp 633-640, issn 0268-3768, 8 p.Article

Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environmentHERROELEN, W; LEUS, R.The Journal of the Operational Research Society. 2005, Vol 56, Num 1, pp 102-109, issn 0160-5682, 8 p.Article

Flexible job-shop scheduling problem under resource constraintsCHAN, F. T. S; WONG, T. C; CHAN, L. Y et al.International journal of production research. 2006, Vol 44, Num 11, pp 2071-2089, issn 0020-7543, 19 p.Article

Assembly line balancing: general resource-constrained caseCOROMINAS, Albert; FERRER, Laia; PASTOR, Rafael et al.International journal of production research. 2011, Vol 49, Num 12-13, pp 3527-3542, issn 0020-7543, 16 p.Article

N-synchronous kahn networks : A relaxed model of synchrony for real-time systemsCOHEN, Albert; DURANTON, Marc; EISENBEIS, Christine et al.ACM SIGPLAN notices. 2006, Vol 41, Num 1, pp 180-193, issn 1523-2867, 14 p.Conference Paper

A methodology for improving enterprise performance by analysing worker capabilities via simulationKERNAN, Brian; LYNCH, Andrew; SHEAHAN, Con et al.International journal of production research. 2011, Vol 49, Num 19-21, pp 5987-5998, issn 0020-7543, 12 p.Article

On the generation of circuits and minimal forbidden setsSTORK, Frederik; UETZ, Marc.Mathematical programming. 2005, Vol 102, Num 1, pp 185-203, issn 0025-5610, 19 p.Article

On the single item multi-supplier system with variable lead-time, price-quantity discount, and resource constraintsCHANG, Ching-Ter; CHIN, Chen-Lung; LIN, Mei-Feng et al.Applied mathematics and computation. 2006, Vol 182, Num 1, pp 89-97, issn 0096-3003, 9 p.Article

Resource Allocation by Means of Project Networks: Dominance ResultsLEUS, Roel.Networks (New York, NY). 2011, Vol 58, Num 1, pp 50-58, issn 0028-3045, 9 p.Article

An acquisition policy for a single item multi-supplier system with real-world constraintsCHANG, Ching-Ter.Applied mathematical modelling. 2006, Vol 30, Num 1, pp 1-9, issn 0307-904X, 9 p.Article

A survey of variants and extensions of the resource-constrained project scheduling problemHARTMANN, Sönke; BRISKORN, Dirk.European journal of operational research. 2010, Vol 207, Num 1, pp 1-14, issn 0377-2217, 14 p.Article

An integrated and flexible architecture for planning and schedulingGARRIDO, Antonio; ONAINDIA, Eva; GARCIA-HERNANDEZ, Ma. De et al.Lecture notes in computer science. 2006, pp 1179-1188, issn 0302-9743, isbn 3-540-35453-0, 1Vol, 10 p.Conference Paper

Resource-constrained project scheduling and timetablingBRUCKER, Peter; KNUST, Sigrid.Lecture notes in computer science. 2001, pp 277-293, issn 0302-9743, isbn 3-540-42421-0Conference Paper

The multiple resource constrained project scheduling problem : A breadth-first approachNAZARETH, T; VERMA, S; BHATTACHARYA, S et al.European journal of operational research. 1999, Vol 112, Num 2, pp 347-366, issn 0377-2217Article

Design-to-criteria scheduling : Real-time agent controlWAGNER, Thomas; LESSER, Victor.Lecture notes in computer science. 2001, pp 128-143, issn 0302-9743, isbn 3-540-42315-XConference Paper

Supervisory control for real-time scheduling of periodic and sporadic tasks with resource constraintsPARK, Seong-Jin; YANG, Jung-Min.Automatica (Oxford). 2009, Vol 45, Num 11, pp 2597-2604, issn 0005-1098, 8 p.Article

Chaotic differential evolution algorithm for resource constrained project scheduling problemWEIMING CHEN; XIAOYANG NI.International journal of computing science and mathematics (Print). 2014, Vol 5, Num 1, pp 81-93, issn 1752-5055, 13 p.Article

FLOW POLYHEDRA AND RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEMSQUILLIOT, Alain; TOUSSAINT, Hélène.RAIRO. Recherche opérationnelle. 2012, Vol 46, Num 4, pp 373-409, issn 0399-0559, 37 p.Article

Resource-constrained flowshop scheduling with separate resource recycling operationsCHENG, T. C. E; LIN, B. M. T; HUANG, H. L et al.Computers & operations research. 2012, Vol 39, Num 6, pp 1206-1212, issn 0305-0548, 7 p.Article

Resource Allocation by Means of Project Networks: Complexity ResultsLEUS, Roel.Networks (New York, NY). 2011, Vol 58, Num 1, pp 59-67, issn 0028-3045, 9 p.Article

  • Page / 10