is.\*:("0926-5805")
Results 1 to 25 of 1071
Selection :
A dynamic programming solution to automate fabrication sequencing of industrial construction componentsDI HU; MOHAMED, Yasser.Automation in construction. 2014, Vol 40, pp 9-20, issn 0926-5805, 12 p.Article
Control of indoor CO2 concentration based on a process modelSKRJANC, Igor; SUBIC, Barbara.Automation in construction. 2014, Vol 42, pp 122-126, issn 0926-5805, 5 p.Article
Economic and environmental assessment of deconstruction strategies using building information modelingAKBARNEZHAD, A; ONG, K. C. G; CHANDRA, L. R et al.Automation in construction. 2014, Vol 37, pp 131-144, issn 0926-5805, 14 p.Article
Efficiency analysis and evaluation of energy-saving pressure-compensated circuit for hybrid hydraulic excavatorTAO WANG; QINGFENG WANG.Automation in construction. 2014, Vol 47, pp 62-68, issn 0926-5805, 7 p.Article
Efficient inverse lighting: A statistical approachFERNÁNDEZ, Eduardo; BESUIEVSKY, Gonzalo.Automation in construction. 2014, Vol 37, pp 48-57, issn 0926-5805, 10 p.Article
Knowledge-assisted BIM-based visual analytics for failure root cause detection in facilities managementMOTAMEDI, Ali; HAMMAD, Amin; ASEN, Yoosef et al.Automation in construction. 2014, Vol 43, pp 73-83, issn 0926-5805, 11 p.Article
Mobile 3D mapping for surveying earthwork projects using an Unmanned Aerial Vehicle (UAV) systemSIEBERT, Sebastian; TEIZER, Jochen.Automation in construction. 2014, Vol 41, pp 1-14, issn 0926-5805, 14 p.Article
Multi-objective genetic optimization for scheduling a multi-storey buildingAGRAMA, Fatma A.Automation in construction. 2014, Vol 44, pp 119-128, issn 0926-5805, 10 p.Article
Natural markers for augmented reality-based indoor navigation and facility maintenanceKOCH, Christian; NEGES, Matthias; KÖNIG, Markus et al.Automation in construction. 2014, Vol 48, pp 18-30, issn 0926-5805, 13 p.Article
Optimum operating performance based online fault-tolerant control strategy for sensor faults in air conditioning systemsYANG, Xue-Bin; JIN, Xin-Qiao; DU, Zhi-Min et al.Automation in construction. 2014, Vol 37, pp 145-154, issn 0926-5805, 10 p.Article
Predicting construction cost overruns using text mining, numerical data and ensemble classifiersWILLIAMS, Trefor P; GONG, Jie.Automation in construction. 2014, Vol 43, pp 23-29, issn 0926-5805, 7 p.Article
Rapid and automated determination of rusted surface areas of a steel bridge for robotic maintenance systemsHYOJOO SON; NAHYAE HWANG; CHANGMIN KIM et al.Automation in construction. 2014, Vol 42, pp 13-24, issn 0926-5805, 12 p.Article
Research on energy saving control strategy of parallel hybrid loaderXIAOHUA ZENG; NANNAN YANG; YUJUN PENG et al.Automation in construction. 2014, Vol 38, pp 100-108, issn 0926-5805, 9 p.Article
Schedule control model for linear projects based on linear scheduling method and constraint programmingYUANJIE TANG; RENGKUI LIU; QUANXIN SUN et al.Automation in construction. 2014, Vol 37, pp 22-37, issn 0926-5805, 16 p.Article
Spatial factors affecting the loading efficiency of excavatorsJUNGHO YOON; JEONGHWAN KIM; JONGWON SEO et al.Automation in construction. 2014, Vol 48, pp 97-106, issn 0926-5805, 10 p.Article
The attribute impact concept: Applications in case-based reasoning and parametric cost estimationAHN, Joseph; JI, Sae-Hyun; MOONSEO PARK et al.Automation in construction. 2014, Vol 43, pp 195-203, issn 0926-5805, 9 p.Article
The time dimension in site layout planningANDAYESH, Mohsen; SADEGHPOUR, Farnaz.Automation in construction. 2014, Vol 44, pp 129-139, issn 0926-5805, 11 p.Article
Use of digital image processing techniques for evaluating wear of cemented carbide bits in rotary drillingSAEIDI, Omid; ROSTAMI, Jamal; ATAEI, Mohammad et al.Automation in construction. 2014, Vol 44, pp 140-151, issn 0926-5805, 12 p.Article
Using PLS-PM to model the process of inter-project learning in construction projectsALI MOHAMMED ALASHWAL; ABDUL-RAHMAN, Hamzah.Automation in construction. 2014, Vol 44, pp 176-182, issn 0926-5805, 7 p.Article
RFID indoor location identification for construction projectsMONTASER, Ali; MOSELHI, Osama.Automation in construction. 2014, Vol 39, pp 167-179, issn 0926-5805, 13 p.Conference Paper
Robotic tile placement: Tools, techniques and feasibilityNATHAN KING; BECHTHOLD, Martin; KANE, Anthony et al.Automation in construction. 2014, Vol 39, pp 161-166, issn 0926-5805, 6 p.Conference Paper
Smart-BIM virtual prototype implementationHEIDARI, Mohammadali; ALLAMEH, Erfaneh; DE VRIES, Bauke et al.Automation in construction. 2014, Vol 39, pp 134-144, issn 0926-5805, 11 p.Conference Paper
A Decision Support System for the determination of concession period length in transportation project under BOT contractYU, C. Y; LAM, K. C.Automation in construction. 2013, Vol 31, pp 114-127, issn 0926-5805, 14 p.Article
A framework for automated control and commissioning of hybrid ventilation systems in complex buildingsMENASSA, Carol C; TAYLOR, Nathan; NELSON, John et al.Automation in construction. 2013, Vol 30, pp 94-103, issn 0926-5805, 10 p.Article
A graph-based model for the identification of the impact of design changesISAAC, S; NAVON, R.Automation in construction. 2013, Vol 31, pp 31-40, issn 0926-5805, 10 p.Article