kw.\*:("ACIERA MN C\!SUB")
Results 1 to 5 of 5
Selection :
DESIGNING A NEW SIDELIFT TRUCK = CONCEPTION D'UN NOUVEAU CHARIOT ELEVATEURSTEVENS G.1980; MET. CONSTR.; ISSN 0307-7896; GBR; DA. 1980; VOL. 12; NO 6; PP. 277-280; LOC. ISArticle
(POSTWELD HEAT TREATMENT. APPLICATION TO LARGE SIZE PRESSURE VESSELS AND TO OFFSHORE STRUCTURES)T AUX STRUCTURES MARINESSIMAR P; SAUVAGE M.1979; SOUDAGE ET TRAITEMENTS THERMIQUES. JOURNEES DE CONFERENCE/1978/MARSEILLE; FRA; PARIS: PSA; DA. 1979; 13 P.; LOC. ISConference Paper
CONSTRUCTION AND REPAIR OF SUB-SEA PIPELINES = POSE ET REPARATION DES PIPELINES SOUS LA MERSNEESBY AP; WESTMORELAND GD.1980; MET. CONSTR.; ISSN 0307-7896; GBR; DA. 1980; VOL. 12; NO 6; PP. 266-271; LOC. ISArticle
THE DESIGN AND REALISATION OF A 100KV, 1A, ELECTRON GUN = LA CONCEPTION ET REALISATION D'UN CANON A ELECTRONS DE 100KV, 1ACAZES R; SAYEGH G.1978; ADVANCES IN WELDING PROCESSES. INTERNATIONAL CONFERENCE. 4/1978/HARROGATE; GBR; ABINGTON, CAMBRIDGE: WELD. INST.; DA. 1978; PP. 317-330; BIBL. 6 REF.; LOC. ISConference Paper
METHODS TO REDUCE STEEL WEAR IN GRINDING MILLSMALGHAN SG.1982; MIN. ENG. (NY); ISSN 0026-5187; USA; DA. 1982-06; VOL. 34; NO 6; PP. 684-690; BIBL. 28 REF.Conference Paper