au.\*:("BRAUN WM")
Results 1 to 8 of 8
Selection :
CONSTRUCTION ASPECTS OF THE BERLIN METRO = QUELQUES ASPECTS DE LA CONSTRUCTION DU METRO DE BERLINBRAUN WM.1982; TUNN. TUNNELL.; ISSN 0041-414X; GBR; DA. 1982; VOL. 14; NO 1; PP. 43-46; 3 P.Article
APPLICATION OF THE NATM IN DEEP TUNNELS AND DIFFICULT ROCK FORMATIONS = APPLICATION DE LA METHODE NATM DANS LES TUNNELS PROFONDS ET LES FORMATIONS DE ROCHES DIFFICILESBRAUN WM.1980; TUNNELS AND TUNNELLG; GBR; DA. 1980; VOL. 12; NO 2; PP. 17-20Article
THE ART OF TUNNELLING IN VIENNA = L'ART DE LA CONSTRUCTION DE TUNNELS SOUTERRAINS A VIENNEBRAUN WM.1974; TUNNELS AND TUNNELLG; G.B.; DA. 1974; VOL. 6; NO 3; PP. 29-32Article
LATTICE GIRDERS OFFER ECONOMY AND PERFORMANCE FOR TUNNEL SUPPORT = DES POUTRES EN TREILLIS OFFRENT ECONOMIE ET PERFORMANCE COMME SUPPORT DE TUNNELBRAUN WM.1983; TUNNELS AND TUNNELLING; ISSN 0041-414X; GBR; DA. 1983; VOL. 15; NO 5; PP. 19-21Article
TUNNELLING BOOM PREDICTED FOR WEST GERMANY. = BOOM DE PERCEMENT DE TUNNEL PREVU EN ALLEMAGNE DE L'OUESTBRAUN WM.1982; TUNN. TUNNELL.; ISSN 0041-414X; GBR; DA. 1982; VOL. 14; NO 1; PP. 41-42Article
KORRIONSSCHUTZ IM INNEREN HOHER SCHORNSTEINE. = CORROSION PROTECTION INSIDE HIGH CHIMNEYS = PROTECTION CONTRE LA CORROSION A L'INTERIEUR DES CHEMINEES DE GRANDE HAUTEURBRAUN WM.1977; V.G.B. KRAFTWERKSTECH.; DTSCH.; DA. 1977; VOL. 57; NO 2; PP. 126-130Article
BLADE SHIELD TUNNELLING MACHINE EXTRUDES ITS OWN LINING = MACHINE DE CONSTRUCTION DE TUNNEL A BOUCLIER A PALE REFOULANT SON PROPRE REVETEMENTMARTIN D; BRAUN WM.1982; TUNN. TUNNELL.; ISSN 0041-414X; GBR; DA. 1982; VOL. 14; NO 2; PP. 54-56; BIBL. 1 REF.Article
QUANTITATIVE DETERMINATION OF 1,2-DIBROMO-3-CHLOROPROPANE IN WHOLE RAT BLOOD AND DRINKING WATER BY GAS CHROMATOGRAPHYKASTL PE; HERMANN EA; BRAUN WM et al.1981; J. CHROMATOGR.; ISSN 0021-9673; NLD; DA. 1981; VOL. 213; NO 1; PP. 156-161; BIBL. 5 REF.Article