Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("CHAMP GAZ FRIGG")

Results 1 to 8 of 8

  • Page / 1
Export

Selection :

  • and

PRODUCTION AND SUPPLY: FRIGG PROJECT DOMINATES THE ENGINEERING YEAR. = PRODUCTION ET DISTRIBUTION: LE PROJET FRIGG DOMINE LES TRAVAUX D'INGENIERIE DE L'ANNEEWALTERS WJ.1976; GAS WORLD; G.B.; DA. 1976; VOL. 181; NO 4686; PP. 23-29 (5P.)Article

CONSTRUCTION UNDER WAY ON FIRST OF FRIGG FIELD SUBSEA GAS LINES. = CONSTRUCTION EN COURS SUR LA PREMIERE DES CONDUITES DE GAZ SOUS-MARINES DU GISEMENT DE FRIGGBOSCHAT JR.1975; PIPE LINE INDUSTRY; U.S.A.; DA. 1975; VOL. 43; NO 1; PP. 25-28Article

FRIGG TRANSPORTATION METERING SYSTEMSDOUCET A.1980; 1980 EUROPEC EUROPEAN OFFSHORE PETROLEUM CONFERENCE & EXHIBITION/1980/LONDON; GBR; LONDON: EUROPEAN OFFSHORE PETROLEUM CONFERENCE & EXHIBITION; DA. 1980; VOL. 1; PP. 239-244; BIBL. 1 REF.Conference Paper

TRANSPORTS. LA CONSTRUCTION DU GAZODUC SOUS-MARIN FRIGG-ECOSSE. = TRANSPORTATION. CONSTRUCTION OF SUBSEA GAS PIPE FRIGG-SCOTLAND1976; REV. ASS. FR. TECHNICIENS PETROLE; FR.; DA. 1976; NO 237; PP. 65-85Article

GAZODUC: LE NOUVEAU NE NORVEGIEN = GAS PIPE: THE NORVEGIAN NEW BORN1981; PET. INF. (1969); ISSN 0150-6463; FRA; DA. 1981; NO 1550; PP. 15-16Article

BRITISH GAS COMPLETES 600-MILE FRIGG NETWORK IN 16 MONTHS.KNOWLES AE.1977; PIPE LINE INDUSTRY; U.S.A.; DA. 1977; VOL. 46; NO 3; PP. 51-55Article

DIVERSE OWNERSHIP PUTS PREMIUM ON ACCURACY IN NORTH SEA'S FRIGG FIELD METERING SYSTEMDOUCET A; WILCOX PL.1981; OIL GAS J.; ISSN 0030-1388; USA; DA. 1981; VOL. 79; NO 38; PP. 163-175; 5 P.Article

GISEMENT DE GAZ DE FRIGG. AUTOMISATION DE LA GESTION ET DE LA CONDUITE DES INSTALLATIONS EN MER = THE FRIGG GASFIELD: AUTOMATED MANAGEMENT AND CONTROL OF OFFSHORE INSTALLATIONSCHAMBRETTE P; LOUVEL B; BEAUCOU R et al.1978; ASS. TECH. INDUSTR. GAZ FR., C.R. CONGR.; FRA; DA. 1978; VOL. 95; PP. 410-432; ABS. ENG/GERConference Paper

  • Page / 1