Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("CHEMIN CRITIQUE")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 831

  • Page / 34
Export

Selection :

  • and

TURNAROUNDS MANAGED USING NETWORK TECHNIQUES = GESTION DES REVISIONS D'UNITES PAR LES TECHNIQUES DE RESEAUXYAKI S.1973; OIL GAS J.; U.S.A.; DA. 1973; VOL. 71; NO 20; PP. 84-86Serial Issue

PROBLEMES D'ENUMERATION SUR LES POLYEDRES DE TRANSPORTEMELICHEV VA; KRAVTSOV MK.1976; VESCI AKAD. NAVUK B.S.S.R., FIZ.-MAT. NAVUK; S.S.S.R.; DA. 1976; NO 1; PP. 9-13; BIBL. 6 REF.Article

CPM USE IN TOP 400 CONSTRUCTION FIRMSDAVIS EW.1974; PROC. AMER. SOC. CIV. ENGNG, J. CONSTR. DIV.; U.S.A.; DA. 1974; VOL. 100; NO 1; PP. 39-49; BIBL. 4 REF.Article

METHODES DE CHEMIN CRITIQUE: APPLICATION PRATIQUE A UN CASBRESSO P.1972; REV. METALLURG.; FR.; DA. 1972; VOL. 69; NO 9; PP. 561-577; ABS. ALLEM. ANGL. ITALSerial Issue

IMPROVE CPM MILESTONE NETWORKSKERRIDGE AE.1978; HYDROCARBON PROCESSG; USA; DA. 1978; VOL. 57; NO 9; PP. 277-291; (7 P.)Article

METHODES DE CHEMIN CRITIQUE: ETUDE COMPARATIVESADELER R.1972; REV. METALLURG.; FR.; DA. 1972; VOL. 69; NO 9; PP. 553-559; ABS. ALLEM. ANGL. ITALSerial Issue

CONCEPT TO COMPLETION.CLARK WG.1978; HYDROCARBON PROCESSG; U.S.A.; DA. 1978; VOL. 57; NO 3; PP. 87-89Article

CRITICAL PATH ANALYSIS IN PROJECT MANAGEMENT = ANALYSE PAR LA METHODE DU CHEMIN CRITIQUE DANS LA GESTION DE PROJETSRINIVAS PRASAD HS.1980; J. INST. ENG., INDIA, CIV. ENG. DIV.; ISSN 0373-1995; IND; DA. 1980; VOL. 60; NO 5; PP. 271-275; BIBL. 5 REF.Article

EIN VERFAHREN FUER DIE EXAKTE BEHANDLUNG VON PROBLEMEN DER ABLAUFPLANUNG MIT HILFSMITTELBESCHRAENKUNGEN = UNE METHODE POUR LE TRAITEMENT EXACT DES PROBLEMES DE PLANIFICATION DE PROJETS A RESSOURCES LIMITEESHOFSTEDT K.1972; MATH. OPER.-FORSCH. STATIST.; DTSCH.; DA. 1972; VOL. 3; NO 4; PP. 239-253; ABS. ANGL. RUSSE; BIBL. 3 REF.Serial Issue

ALGORITHMES CONCERNANT L'ALLOCATION DES RESSOURCES DANS L'ANALYSE DU CHEMIN CRITIQUENICULESCU V.1972; STUD. CERC. CALC. ECON. CIBERN. ECON.; ROMAN; DA. 1972; NO 6; PP. 51-66; BIBL. 6 REF.Serial Issue

TECHNIQUES TO IMPROVE POWER PLANT PRODUCTIVITYSHURTZ S.1978; AMERICAN POWER CONFERENCE/1978/CHICAGO; USA; DA. 1978; 13 P.Conference Paper

ALTERNATE METHODS OF PROJECT SCHEDULING WITH LIMITED RESOURCES.PATTERSON JH.1974; NAV. RES. LOGIST. QUART.; U.S.A.; DA. 1974; VOL. 20; NO 4; PP. 767-784; BIBL. 1 P. 1/2Article

VERALLGEMEINERUNGEN IN DER STRUKTUR UND ERWEITERUNGEN IN DER ZEITANALYSE BEI VORGANSPFEIL-NETZPLAENEN. = GENERALISATIONS DANS LA STRUCTURE ET L'ANALYSE DU TEMPS DANS DES RESEAUX DE TYPE CHEMIN CRITIQUEALTROGGE G.1976; Z. OPER. RES.; DTSCH.; DA. 1976; VOL. 20; NO 5; PP. 219-231; ABS. ANGL.; BIBL. 4 REF.Article

ARROW TO PRECEDENCE NETWORK TRANSFORMATION (H).CRANDALL KC.1974; COMMUNIC. A.C.M.; U.S.A.; DA. 1974; VOL. 17; NO 8; PP. 467-469Article

METHOD FOR FINDING THE CRITICAL PATHS THROUGH A NETWORK AND PRACTICAL APPLICATION IN THE EXTENSIVE REPAIRS OF THE CHEMICAL PLANTSIVAN M.1972; IN: PRACT. APPL. PROJ. PLANN. NETWORK TECH. 3RD INT. CONGR. STOCKHOLM, 1972; STOCKHOLM; ALMQUIST WIKSELL; DA. 1972; VOL. 3; PP. 265-273; BIBL. 6 REF.Conference Proceedings

THE CEMPLAN SYSTEMKELSALL JJ; LUCAS C.1972; IN: PRACT. APPL. PROJ. PLANN. NETWORK TECH. 3RD INT. CONGR. STOCKHOLM, 1972; STOCKHOLM; ALMQUIST WIKSELL; DA. 1972; VOL. 3; PP. 489-508Conference Proceedings

AN ESTIMATE OF EXPECTED CRITICAL-PATH LENGTH IN PERT NETWORKSLINDSEY JH II.1972; OPER. RES.; U.S.A.; DA. 1972; VOL. 20; NO 4; PP. 800-812; BIBL. 4 REF.Serial Issue

COMPUTER APPLICATIONS IN CONSTRUCTION MANAGEMENT.NARINDAR BHANDARI.1977; PROC. AMER. SOC. CIV. ENGRS, J. CONSTR. DIV.; U.S.A.; DA. 1977; VOL. 103; NO 3; PP. 343-356; BIBL. 7 REF.Article

A CRITICAL PATH GENERALIZATION OF THE ADDITIVE FACTOR METHOD: ANALYSIS OF A STROOP TASKSCHWEICKERT R.1978; J. MATH. PSYCHOL.; USA; DA. 1978; VOL. 18; NO 2; PP. 105-139; BIBL. 25 REF.Article

CONCRETE DAM CONSTRUCTION: A CRITICAL PATH METHOD APPROACH.JOSHI LS.1976; INDIAN CONCR. J.; INDIA; DA. 1976; VOL. 50; NO 12; PP. 367-374 (5P.); BIBL. 4 REF.Article

PLANNING FOR A MEDIUM SIZED CHEMICAL PLANTPROCTOR A.1972; PROCESS TECHNOL. INTERNATION.; G.B.; DA. 1972; VOL. 17; NO 10; PP. 781-783Serial Issue

CONVEX MAJORIZATION WITH AN APPLICATION TO THE LENGTH OF CRITICAL PATHSMEILIJSON I; NADAS A.1979; J. APPL. PROBABIL.; GBR; DA. 1979; VOL. 16; NO 3; PP. 671-677; BIBL. 6 REF.Article

PRODUCTIVITY IN THE CONSTRUCTION INDUSTRY MANAGEMENT PROCESSES.PELTIER EJ.1978; ENGNG ISSUES; U.S.A.; DA. 1978; VOL. 104; NO 1; PP. 53-56Article

INTEGRATED PLANNING OF A PIPE-LINE RENEWAL PROJECT BY NETWORK ANALYSISJOSHI LS.1975; INDIAN CONCR. J.; INDIA; DA. 1975; VOL. 49; NO 12; PP. 366-371; BIBL. 7 REF.Article

PLANNING CONSTRUCTION OF REPETITIVE BUILDING UNITS. = PLANIFICATION DE LA CONSTRUCTION D'UNITES DE BATIMENTS REPETITIVESCARR RI; MEYER WL.1974; PROC. AMER. SOC. CIV. ENGRS, J. CONSTR. DIV.; U.S.A.; DA. 1974; VOL. 100; NO 3; PP. 403-412; BIBL. 7 REF.Article

  • Page / 34