Pascal and Francis Bibliographic Databases

Help

Search results

Your search

au.\*:("CHOWDHURY IG")

Results 1 to 5 of 5

  • Page / 1
Export

Selection :

  • and

CONDITIONS FOR OPTIMAL SCHEDULING FOR THE THREE-MACHINE PROBLEM.EILON S; CHOWDHURY IG.1976; J. INST. MATH. APPL., LONDON; G.B.; DA. 1976; VOL. 17; NO 1; PP. 1-4; BIBL. 4 REF.Article

STUDIES IN A SIMULATED JOB SHOP = ETUDES D'UN ATELIER PAR SIMULATIONEILON S; CHOWDHURY IG.1975; INSTIT. MECH. ENGRS, PROC; G.B.; DA. 1975; VOL. 189; NO 30; PP. 417-425; BIBL. 10REF.Serial Issue

MINIMISING WAITING TIME VARIANCE IN THE SINGLE MACHINE PROBLEM.EILON S; CHOWDHURY IG.1977; MANAG. SCI.; U.S.A.; DA. 1977; VOL. 23; NO 6; PP. 567-575; BIBL. 3 REF.Article

COMPARISON OF TECHNIQUES FOR ASSESSING THE DYNAMIC PERFORMANCE OF MACHINE TOOLS = COMPARAISON DES TECHNIQUES POUR LA DETERMINATION DU COMPORTEMENT DYNAMIQUE DES OUTILSSADEK MM; CHOWDHURY IG.1973; MACHIN. PRODUCT. ENGNG; G.B.; DA. 1973; VOL. 122; NO 3144; PP. 246-253; BIBL. 21 REF.Serial Issue

EXPERIMENTS WITH THE SI X RULE IN JOB-SHOP SCHEDULING.EILON S; CHOWDHURY IG; SERGHIOU SS et al.1975; SIMULATION; U.S.A.; DA. 1975; VOL. 24; NO 2; PP. 45-48; BIBL. 8 REF.Article

  • Page / 1