Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("COMPLETE TRAIN LOAD")

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 29

  • Page / 2
Export

Selection :

  • and

DB-PRODUKTIONSPLANUNG SCHIENENGUETERVERKEHR. PLANUNG VON GESCHLOSSENEN ZUEGEN = PRODUCTION DU CHEMIN DE FER FEDERAL ALLEMAND DANS LE TRAFIC FERROVIAIRE DE MARCHANDISES: PLANIFICATION DE TRAINS COMPLETSBLUM L.1980; E.T.R.; DEU; DA. 1980; VOL. 29; NO 1-2; PP. 11-15; ABS. ENG/FRE/SPA; BIBL. 5 REF.Article

INTERCONTAINER MASTERS THE ART OF MARKETING ACROSS FRONTIERSHJELT P.1979; RAILWAY GAZ. INTERNATION.; GBR; DA. 1979; VOL. 135; NO 8; PP. 715-719; ABS. FRE/GER/SPAArticle

BN TRACKS ARE READY AS COAL PRODUCTION TAKES OFFJOHNSTON W.1979; RAILWAY GAZ. INTERNATION.; GBR; DA. 1979; VOL. 135; NO 10; PP. 891-894; ABS. FRE/GER/SPAArticle

PRESSURE ON PKP FORCES PACE OF IMPROVEMENT PROGRAMME1980; RAILW. GAZ. INT.; ISSN 0373-5346; GBR; DA. 1980; VOL. 136; NO 11; PP. 972-975Article

MODELL FUER DIE PLANUNG VON GUETERZUGVERBINDUNGEN IM NAHBEREICH. = MODELE DE PLANIFICATION DES RELATIONS DE TRAINS DE MARCHANDISES A COURTE DISTANCEZIEGLER G; JUROWIEC F.1977; EISENBAHNTECHNIK; DTSCH.; DA. 1977; VOL. 25; NO 4; PP. 162-164; ABS. RUSSE ANGL. FR.; BIBL. 5 REF.Article

DAS NEUE LEITSYSTEM IM WAGENLADUNGSVERKEHR DER DB. = LE NOUVEAU SYSTEME D'ACHEMINEMENT DANS LE TRAFIC DE WAGONS COMPLETS DU CHEMIN DE FER FEDERAL ALLEMANDHECK A; SCHULZ E.1976; BUNDESBAHN; DTSCH.; DA. 1976; VOL. 52; NO 5; PP. 331-336Article

BURLINGTON NORTHERN'S NEW GILLETTE-ORIN LINEANDERSON BG.1980; AMER. RAILWAY ENGNG ASS., BULL.; USA; DA. 1980; VOL. 81; PP. 332-350Conference Paper

MOPAC: FAST-GROWING AND PROFITABLE1979; INTERNATION. RAILWAY J.; USA; DA. 1979-10; PP. 45-62; (7 P.)Article

RESTRUCTURATION DE L'OFFRE FERROVIAIRE MARCHANDISES DANS LA ZONE DU MANSFLINOIS JL; GOBBI P.1979; REV. GEN. CHEM. FER; FRA; DA. 1979-04; VOL. 98; PP. 171-178; ABS. ENG/GERArticle

LES TRAINS COMPLETSDAUMAS J; GARANDEL F.1978; REV. GEN. CHEM. FER; FRA; DA. 1978-11; VOL. 97; PP. 711-725; ABS. ENG/GERArticle

ZUR VERVOLLKOMMUNG DER INTERNATIONALEN EISENBAHN-GUETERTRANSPORTE = POUR LE PERFECTIONNEMENT DES TRANSPORTS FERROVIAIRES INTERNATIONAUX DE MARCHANDISESTSRKON R.1978; Z.O.S.SH.D.; POL; DA. 1978; VOL. 21; NO 4; PP. 5-7Article

EINSATZ EINER AUTOMATISCHEN WAGENERKENNUNG BEI DER MASSENGUT-UMSCHLAGANLAGE HANSAPORT = UTILISATION D'UN SYSTEME D'IDENTIFICATION AUTOMATIQUE DES WAGONS SUR LE CHANTIER DE TRANSBORDEMENT DE PONDEREUX HANSAPORTTHOMAS E; LINHARDT W.1978; E.T.R.; DEU; DA. 1978; VOL. 27; NO 4; PP. 219-221; ABS. ANGL. FR. ESP.; BIBL. 6 REF.Article

MERRY-GO-ROUND COMPUTERISEDALLEN GF.1980; MOD. RAILWAYS; GBR; DA. 1980; VOL. 37; NO 378; PP. 110-115Article

NEW FACILITIES FOR INCREASED TRAFFIC AT ALLIANCEWOXLAND MO.1980; AMER. RAILWAY ENGNG ASS., BULL.; USA; DA. 1980; VOL. 81; PP. 390-401Conference Paper

DIE PRODUKTION DER DEUTSCHEN BUNDESBAHN IM RAHMEN DES MARKETING-GUETERVERKEHR = LA PRODUCTION DU CHEMIN DE FER FEDERAL ALLEMAND DANS LE CADRE DU TRANSPORT COMMERCIAL DES MARCHANDISESSCOTLAND R; KUBLER F.1978; E.T.R.; DEU; DA. 1978; VOL. 27; NO 9; PP. 523-528; ABS. ENG/FRE/SPAArticle

UNIT TRAIN/GREAT LAKES BULK SHIP COST COMPARISON.BEIMBORN EA; SOOMRO MT.1977; PROC. AMER. SOC. CIV. ENGRS, TRANSPORT. ENGNG J. A.S.C.E.; U.S.A.; DA. 1977; VOL. 103; NO 5; PP. 545-554; BIBL. 6 REF.Article

INTENSIVIERUNG DER TRANSPORTPROZESSE DURCH GANZZUGBILDUNG-ABSENDERGANZZUEGE = INTENSIFICATION DES PROCESSUS DE TRANSPORTS PAR LA FORMATION DE TRAINS COMPLETS. TRAINS FORMES PAR L'EXPEDITEURVONAU R.1981; EISENBAHNPRAXIS; ISSN 0013-2780; DDR; DA. 1981; VOL. 25; NO 2; PP. 78-79Article

THE UNIT TRAIN: THE RAILROAD'S RESPONSE TO COMPETITION IN THE UNITED STATESSTARR JT.1978; TRANSPORT. J.; USA; DA. 1978; VOL. 18; NO 2; PP. 29-42Article

Die Programmierung des Masengut-verkehrs in geschlossenen Zügen = Programming for mass freight transport in block trainsGROSS, W; RIEKS, H. G.ETR. Eisenbahntechnische Rundschau. 1995, Vol 44, Num 9, pp 649-654, issn 0013-2845Article

RAIL AND OCEAN MINERAL TRANSPORT1979; ENGNG MING J.; USA; DA. 1979; VOL. 180; NO 6; PP. 196-226Article

THE UNIT TRAIN AND THE DEVELOPMENT OF LOW SULFUR COAL RESOURCES IN THE WESTERN INTERIOR REGIONWARREN WD.1979; TRANSPORT. J.; USA; DA. 1979; VOL. 18; NO 4; PP. 53-63; BIBL. 19 REF.Article

COAL MERRY-GO-ROUND AND STANDARD-GAUGE RAIL LAYOUTSBLOGG RA.1980; COLLIERY GUARD.; GBR; DA. 1980; VOL. 228; NO 3; PP. 133-135Article

Microprocessor-based weighing and control system improves in-motion loading of coal trainsSTEARNS, D. M.Mining engineering. 1985, Vol 37, Num 3, pp 235-237, issn 0026-5187Article

Skyline Utah fuel dedicates unit-train loadout facilityJACKSON, D.Coal mining (Chicago, Ill.). 1985, Vol 22, Num 11, pp 28-29, issn 0749-1948Article

Une nouvelle étape de l'informatisation du calcul des coûts marchandises: le modèle «trains complets» = A further stage in the computerisation of freight cost calculations: the complete train-load modelSOUDRY, P; PIGE, J.-C.Revue générale des chemins de fer (1924). 1988, Vol 107, Num 1, pp 33-39, issn 0035-3183Article

  • Page / 2