Pascal and Francis Bibliographic Databases

Help

Search results

Your search

jo.\*:("Cost engineering (Morgantown, W. Va.)")

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 115

  • Page / 5
Export

Selection :

  • and

Guidelines to mitigate schedule delay, from the owner's viewpointCASINELLI, Massimoluigi.Cost engineering (Morgantown, W. Va.). 2005, Vol 47, Num 2, pp 21-27, issn 0274-9696, 7 p.Article

Using earned value management indexes as team development factor and a compensation toolVARGAS, Ricardo Viand.Cost engineering (Morgantown, W. Va.). 2005, Vol 47, Num 5, pp 20-25, issn 0274-9696, 6 p.Article

Charting a successful global dispute resolutionBELCHER, Osmond F.Cost engineering (Morgantown, W. Va.). 2005, Vol 47, Num 12, pp 24-33, issn 0274-9696, 10 p.Article

The application of risk management in infrastructure construction projectsALI, Rashed.Cost engineering (Morgantown, W. Va.). 2005, Vol 47, Num 8, pp 20-27, issn 0274-9696, 8 p.Article

Cost management: Roadmap to project success: Supplementing accounting systems for project cost managementWULKE, Rita; KOHL, Bud.Cost engineering (Morgantown, W. Va.). 2004, Vol 46, Num 8, pp 11-13, issn 0274-9696, 3 p.Article

Cost and schedule control for engineering contractsDAVEY, Kenneth R.Cost engineering (Morgantown, W. Va.). 2004, Vol 46, Num 9, pp 16-22, issn 0274-9696, 7 p.Article

Work and resource breakdown structures for formalized bottom-up estimatingRAD, Parviz F; CIOFFI, Denis F.Cost engineering (Morgantown, W. Va.). 2004, Vol 46, Num 2, pp 31-37, issn 0274-9696, 7 p.Article

Computing near-longest path. Part 2: Now that I have longest path value, what's it good for?WINTER, Ron.Cost engineering (Morgantown, W. Va.). 2003, Vol 45, Num 2, pp 26-30, issn 0274-9696, 5 p.Article

Effect of multiple calendars on total float and critical pathSCAVINO, Nestor J.Cost engineering (Morgantown, W. Va.). 2003, Vol 45, Num 6, pp 11-15, issn 0274-9696, 5 p.Article

Measured mile Process. Project controls to support equitable recovery of production inefficiency claimsPRESNELL, Thomas W.Cost engineering (Morgantown, W. Va.). 2003, Vol 45, Num 11, pp 14-20, issn 0274-9696, 7 p.Article

Owner caused delay: Field overhead damagesLANKENAU, Matthew James.Cost engineering (Morgantown, W. Va.). 2003, Vol 45, Num 9, pp 13-17, issn 0274-9696, 5 p.Article

Weather derivatives allow construction to hedge weather riskCONNORS, Robert B.Cost engineering (Morgantown, W. Va.). 2003, Vol 45, Num 3, pp 21-24, issn 0274-9696, 4 p.Article

Analysis of change order markup allowances on stipulated price building contracts = Analyse des indemnités dans la majoration d'un changement de commande sur les contrats à prix fixesFAYEK, A. R; NKUAH, M. Y.Cost engineering (Morgantown, W. Va.). 2002, Vol 44, Num 1, pp 28-31, issn 0274-9696Article

Assessment of the problems of application of life cycle costing in construction projectsASSAF, S.A; AL-HAMMAD, A; JANNADI, O.A et al.Cost engineering (Morgantown, W. Va.). 2002, Vol 44, Num 2, pp 17-22, issn 0274-9696Article

(DRAFT) Recommended Practice No. 21R-98. Project Code of Accounts. As applied in engineering, procurement, and construction for the process industriesSILLAK, G.C.Cost engineering (Morgantown, W. Va.). 2002, Vol 44, Num 7, pp 42-53, issn 0274-9696, 12 p.Article

Factors contributing to construction costs in Saudi ArabiaBUBSHAIT, A.A; AL-JUWAIRAH, Y.A.Cost engineering (Morgantown, W. Va.). 2002, Vol 44, Num 5, pp 30-34, issn 0274-9696, 5 p.Article

Hazardous, toxic, and radiological waste remedial action work breakdown structureGUTIERREZ, J.A.Cost engineering (Morgantown, W. Va.). 2002, Vol 44, Num 4, pp 34-40, issn 0274-9696, 7 p.Article

Weather delays and impactsMCDONALD, D.F.Cost engineering (Morgantown, W. Va.). 2000, Vol 42, Num 5, pp 34-39, issn 0274-9696Article

Pacing delays : the practical effectZACK, J.G.Cost engineering (Morgantown, W. Va.). 2000, Vol 42, Num 7, pp 23-28, issn 0274-9696Article

The pitfalls of CPM scheduling on construction projectsSTREET, I.A.Cost engineering (Morgantown, W. Va.). 2000, Vol 42, Num 8, pp 35-37, issn 0274-9696Article

The project Achilles Heel : misalignmentSKULMOSKI, G.J; HARTMAN, F.T.Cost engineering (Morgantown, W. Va.). 2000, Vol 42, Num 12, pp 33-37, issn 0274-9696Article

The cost of coastal storm surge damage reductionBURRUS, R.T; DUMAS, C.F; GRAHAM, J.E et al.Cost engineering (Morgantown, W. Va.). 2000, Vol 43, Num 3, pp 38-44, issn 0274-9696Article

Decision support system for pipeline route selection = Système d'aide à la décision pour le choix du tracé d'un pipelineDEY, P. K; GUPTA, S. S.Cost engineering (Morgantown, W. Va.). 1999, Vol 41, Num 10, pp 29-35, issn 0274-9696Article

Cost engineering considerations in privatization = Considérations techniques sur le coût dans la privatisationZOCHER, A. M; PAANANEN, O.H; SOHN, C et al.Cost engineering (Morgantown, W. Va.). 1997, Vol 39, Num 7, pp 37-40, issn 0274-9696Article

Automation of pre-bidding process for construction projectsKANDANALA, Rajesh; AL-HUSSEIN, Mohamed; VANDERSTAR, Aubrey et al.Cost engineering (Morgantown, W. Va.). 2005, Vol 47, Num 6, pp 30-34, issn 0274-9696, 5 p.Article

  • Page / 5