Pascal and Francis Bibliographic Databases

Help

Search results

Your search

au.\*:("GEIRINGER SL")

Results 1 to 3 of 3

  • Page / 1
Export

Selection :

  • and

POWER GENERATION AT MEDICAL COMPLEX USING SOLID WASTE INCINERATIONGEIRINGER SL.1975; PUBLIC WORKS; U.S.A.; DA. 1975; VOL. 106; NO 10; PP. 76-77Article

CONSTRUCTION AND OPERATING COST COMPARISON BETWEEN FIELD-ERECTED AND PACKAGE COMBINED-CYCLE UNITS = COMPARAISON DES COUTS DE CONSTRUCTION ET DE FONCTIONNEMENT D'UNITES A CYCLE COMBINE DE TYPE COMPACT OU MONTEES SUR PLACEGEIRINGER SL.1974; PROC. AMER. POWER CONF.; U.S.A.; DA. 1974; VOL. 36; PP. 313-319; BIBL. 3 REF.; (AM. POWER CONF. 36TH. ANNU. MEET. PROC.; CHICAGO; 1974)Conference Paper

ON-SITE POWER GENERATION THROUGH THE USE OF FUEL AND SOLID WASTE AT THE HARVARD MEDICAL AREA = PRODUCTION AUTONOME DE PUISSANCE PAR UTILISATION DE FUEL ET DE DECHETS SOLIDES DANS L'HARVARD MEDICAL AREA.GEIRINGER SL; GEIRINGER PL.1975; IN: ENERGY 10. INTERSOC. ENERGY CONVERS. ENG. CONF. 10; NEWARK, DEL.; 1975; NEW YORK; INST. ELECTR. ELECTRON. ENG.; DA. 1975; PP. 482-485Conference Paper

  • Page / 1