Pascal and Francis Bibliographic Databases

Help

Search results

Your search

au.\*:("GOMIS JP")

Results 1 to 3 of 3

  • Page / 1
Export

Selection :

  • and

POWER SUPPLY OF ELECTRICAL ENERGY CONTROL SYSTEM OF AN AIRPORTGOMIS JP; GRENIER C.1981; MEDIUM-SIZE PHOTOVOLTAIC POWER PLANTS. WORKSHOP/1980/SOPHIA-ANTIPOLIS; NLD/USA/GBR; DORDRECHT; BOSTON; LONDON: D. REIDEL; DA. 1981; PP. 102-104Conference Paper

POWER SUPPLY FOR A SOLAR WATER HEATING INSTALLATIONGOMIS JP; VIALART JC.1981; MEDIUM-SIZE PHOTOVOLTAIC POWER PLANTS. WORKSHOP/1980/SOPHIA-ANTIPOLIS; NLD/USA/GBR; DORDRECHT; BOSTON; LONDON: D. REIDEL; DA. 1981; PP. 81-84Conference Paper

LE COCKPIT DE L'HÉLICOPTÈRE DE COMBAT TIGRE: UNE INTERFACE HOMME-MACHINE QUI RÉVOLUTIONNE LA SYNERGIE DES ÉQUIPAGES = Ergonomy of the french cambat helicopter Tiger: what does it change for the crew synergy?HORNEZ, Ap; CHEVALIER, C; NEEL, F et al.Médecine aéronautique et spatiale. 2011, Vol 52, Num 195, pp 107-112, issn 0294-0817, 6 p.Article

  • Page / 1