Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("Integrated planning")

Filter

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 2296

  • Page / 92
Export

Selection :

  • and

Analysis of job flow-time in a job shopCHENG, T. C. E.The Journal of the Operational Research Society. 1985, Vol 36, Num 3, pp 225-230, issn 0160-5682Article

Inequalities and bounds for the scheduling of stochastic jobs on parallel machinesPINEDO, M; SCHECHNER, Z.Journal of applied probability. 1985, Vol 22, Num 3, pp 739-744, issn 0021-9002Article

Stochastically minimizing the makespan in flow shopsFOLEY, R. D; SURESH, S.Naval research logistics quarterly. 1984, Vol 31, Num 4, pp 551-557, issn 0028-1441Article

Bin packing and multiprocessor scheduling problems with side constraint on job typesMORIHARA, I; IBARAKI, T; HASEGAWA, T et al.Discrete applied mathematics. 1983, Vol 6, Num 2, pp 173-191, issn 0166-218XArticle

On Pinedo's conjecture for scheduling in a stochastic flow shopSURESH, S; FOLEY, R. D; DICKEY, S. E et al.Operations research. 1985, Vol 33, Num 5, pp 1146-1153, issn 0030-364XArticle

Production scheduling with overtime considerationsCONLEY, W.International journal on policy and information. 1985, Vol 9, Num 1, pp 149-157, issn 0251-1266Article

Focused scheduling in proportionate flowshopsPENG SI OW.Management science. 1985, Vol 31, Num 7, pp 852-869, issn 0025-1909Article

Composite cost-based rules for priority scheduling in a randomly routed job shopSCUDDER, G. D; HOFFMANN, T. R.International journal of production research. 1985, Vol 23, Num 6, pp 1185-1195, issn 0020-7543Article

Analysis of group technology scheduling heuristicsMOSIER, C. T; ELVERS, D. A; KELLY, D et al.International journal of production research. 1984, Vol 22, Num 5, pp 857-875, issn 0020-7543Article

Transportation of Job-blocks with separated setup times and removal timesBAGGA, P. C; KHURANA, K.Cahiers du Centre d'études de recherche opérationnelle. 1984, Vol 26, Num 3-4, pp 195-200, issn 0008-9737Article

Analytical determination of optimal TWK due-dates in a job shopCHENG, T. C. E.International journal of systems science. 1985, Vol 16, Num 6, pp 777-787, issn 0020-7721Article

Allocating continuous doubly constrained resources among parallel production activities to meet deadlinesWEGLARZ, J.Automatique-productique informatique industrielle. 1986, Vol 19, Num 5, pp 497-507, issn 0296-1598Article

Scheduling with multiple performance measures: the one-machine caseNELSON, R. T; SARIN, R. K; DANIELS, R. L et al.Management science. 1986, Vol 32, Num 4, pp 464-479, issn 0025-1909Article

The use of value-based rules to avoid shop disruptionSCUDDER, G. D; HOFFMANN, T. R.Omega (Oxford). 1986, Vol 14, Num 3, pp 259-264, issn 0305-0483Article

On minimizing flow time on processors with variable unit processing timeHUANG, H. C.Operations research. 1986, Vol 34, Num 5, pp 801-802, issn 0030-364XArticle

Minimizing weighted completion times with deadlinesPOSNER, M. E.Operations research. 1985, Vol 33, Num 3, pp 562-574, issn 0030-364XArticle

On cyclic sequence types for constructing cyclic schedulesDAUSCHA, W; MODROW, H. D; NEUMANN, A et al.Zeitschrift für Operations Research. 1985, Vol 29, Num 1, pp 1-30, issn 0373-790XArticle

On the complexity of preemptive open-shop scheduling problemsLIU, C. Y; BULFIN, R. L.Operations research letters. 1985, Vol 4, Num 8, pp 71-74, issn 0167-6377Article

Single machine lot scheduling: a comparison of some solution proceduresFAYEZ FOUAD BOCTOR.Automatique-productique informatique industrielle. 1985, Vol 19, Num 4, pp 389-402, issn 0296-1598Article

Openshop and flowshop scheduling to minimize sum of completion timesADIRI, I; AMIT, N.Computers & operations research. 1984, Vol 11, Num 3, pp 275-284, issn 0305-0548Article

Tactically delayed versus non-delay scheduling: an experimental investigationKANET, J. J.European journal of operational research. 1986, Vol 24, Num 1, pp 99-105, issn 0377-2217Article

Due-date determination for an single-machine shop with SPT dispatehingCHENG, T. C. E.Engineering costs and production economics. 1986, Vol 10, Num 1, pp 35-41, issn 0167-188XArticle

Optimal schedules for periodically recurring eventsBURKARD, R. E.Discrete applied mathematics. 1986, Vol 15, Num 2-3, pp 167-180, issn 0166-218XArticle

Three-machine flowshop stochastic scheduling to minimize distribution of schedule lengthFROSTIG, E; ADIRI, I.Naval research logistics quarterly. 1985, Vol 32, Num 1, pp 179-183, issn 0028-1441Article

A cyclical scheduling heuristic for lot sizing with capacity constraintsBAHL, H. C; RITZMAN, L. P.International journal of production research. 1984, Vol 22, Num 5, pp 791-800, issn 0020-7543Article

  • Page / 92