Pascal and Francis Bibliographic Databases

Help

Search results

Your search

au.\*:("KARIMI, I. A")

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 44

  • Page / 2
Export

Selection :

  • and

Evaluation of utilization alternatives for stranded natural gasKHALILPOUR, Rajab; KARIMI, I. A.Energy (Oxford). 2012, Vol 40, Num 1, pp 317-328, issn 0360-5442, 12 p.Article

Selection of Liquefied Natural Gas (LNG) Contracts for Minimizing Procurement CostKHALILPOUR, Rajab; KARIMI, I. A.Industrial & engineering chemistry research. 2011, Vol 50, Num 17, pp 10298-10312, issn 0888-5885, 15 p.Article

Efficient heuristics for inventory placement in acyclic networksJIA SHU; KARIMI, I. A.Computers & operations research. 2009, Vol 36, Num 11, pp 2899-2904, issn 0305-0548, 6 p.Article

Planning in pharmaceutical supply chains with outsourcing and new product introductionsSUNDARAMOORTHY, Arul; KARIMI, I. A.Industrial & engineering chemistry research. 2004, Vol 43, Num 26, pp 8293-8306, issn 0888-5885, 14 p.Article

Completion times in serial mixed-storage multiproduct processes with transfer and set-up timesRAJAGOPALAN, D; KARIMI, I. A.Computers & chemical engineering. 1989, Vol 13, Num 1-2, pp 175-186, issn 0098-1354Conference Paper

Scheduling Gasoline Blending Operations from Recipe Determination to Shipping Using Unit SlotsJIE LI; KARIMI, I. A.Industrial & engineering chemistry research. 2011, Vol 50, Num 15, pp 9156-9174, issn 0888-5885, 19 p.Article

Integrated campaign planning and resource allocation in batch plantsSUSARLA, Naresh; KARIMI, I. A.Computers & chemical engineering. 2011, Vol 35, Num 12, pp 2990-3001, issn 0098-1354, 12 p.Article

Scheduling tanker-lightering operations in crude oil transportationCHENG HUANG; KARIMI, I. A.Industrial & engineering chemistry research. 2006, Vol 45, Num 24, pp 8063-8082, issn 0888-5885, 20 p.Article

Scheduling parallel production lines with resource constraints. 2. Decomposition algorithmLAMBA, Nitin; KARIMI, I. A.Industrial & engineering chemistry research. 2002, Vol 41, Num 4, pp 790-800, issn 0888-5885Article

Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storageYU LIU; KARIMI, I. A.Chemical engineering science. 2007, Vol 62, Num 6, pp 1549-1566, issn 0009-2509, 18 p.Article

Scheduling trans-shipment operations in maritime chemical transportationCHENG HUANG; KARIMI, I. A.Industrial & engineering chemistry research. 2006, Vol 45, Num 6, pp 1955-1973, issn 0888-5885, 19 p.Article

Scheduling a two-stage multiproduct process with limited product shelf life in intermediate storageGUPTA, Sushant; KARIMI, I. A.Industrial & engineering chemistry research. 2003, Vol 42, Num 3, pp 490-508, issn 0888-5885, 19 p.Article

An MILP approach to automated wet-etch station schedulingBHUSHAN, Swarnendu; KARIMI, I. A.Industrial & engineering chemistry research. 2003, Vol 42, Num 7, pp 1391-1399, issn 0888-5885, 9 p.Article

Analysis of a tubular zeolite membrane processKARIMI, I. A; FAROOQ, S.Chemical engineering science. 1999, Vol 54, Num 18, pp 4111-4121, issn 0009-2509Article

Scheduling algorithms for serial multiproduct batch processes with tardiness penaltiesKU, H.-M; KARIMI, I. A.Computers & chemical engineering. 1991, Vol 15, Num 5, pp 283-286, issn 0098-1354, 4 p.Article

Intermediate storage in noncontinuous processes involving stages of parallel unitsKARIMI, I. A; REKLAITIS, G. V.AIChE journal. 1985, Vol 31, Num 1, pp 44-52, issn 0001-1541Article

Design of biomass and natural gas based IGFC using multi-objective optimizationPAVAN KUMAR NARAHARISETTI; LAKSHMINARAYANAN, S; KARIMI, I. A et al.Energy (Oxford). 2014, Vol 73, pp 635-652, issn 0360-5442, 18 p.Article

Global multiproduct production-distribution planning with duty drawbacksOH, Hong-Choon; KARIMI, I. A.AIChE journal. 2006, Vol 52, Num 2, pp 595-610, issn 0001-1541, 16 p.Article

A slot-based formulation for single-stage multiproduct batch plants with multiple orders per productLIM, May-Fong; KARIMI, I. A.Industrial & engineering chemistry research. 2003, Vol 42, Num 9, pp 1914-1924, issn 0888-5885, 11 p.Article

Branching and stability of stationary solutions in multi-equation systemsKARIMI, I. A; INAMDAR, Satish R.Chemical engineering science. 2002, Vol 57, Num 8, pp 1251-1267, issn 0009-2509Article

Identification of transport mechanism in adsorbent micropores from column dynamicsFAROOQ, S; HUANG QINGLIN; KARIMI, I. A et al.Industrial & engineering chemistry research. 2002, Vol 41, Num 5, pp 1098-1106, issn 0888-5885Article

Robustness Measures for Operation Schedules Subject to DisruptionsKARRI, Badarinath; SRINIVASAN, Rajagopalan; KARIMI, I. A et al.Industrial & engineering chemistry research. 2009, Vol 48, Num 20, pp 9204-9214, issn 0888-5885, 11 p.Article

Scheduling tank container movements for chemical logisticsKARIMI, I. A; SHARAFALI, M; MAHALINGAM, H et al.AIChE journal. 2005, Vol 51, Num 1, pp 178-197, issn 0001-1541, 20 p.Article

Resource-constrained scheduling of parallel production lines using asynchronous slotsLIM, May-Fong; KARIMI, I. A.Industrial & engineering chemistry research. 2003, Vol 42, Num 26, pp 6832-6842, issn 0888-5885, 11 p.Article

Planning and scheduling of parallel semicontinuous processes. 1. Production planningMCDONALD, C. M; KARIMI, I. A.Industrial & engineering chemistry research. 1997, Vol 36, Num 7, pp 2691-2700, issn 0888-5885Article

  • Page / 2