kw.\*:("Lead time")
Results 1 to 25 of 895
Selection :
Effects of inventory miscount and non-inclusion of lead time variability on inventory system performanceSAMEER KUMAR; ARORA, S.IIE transactions. 1992, Vol 24, Num 2, pp 96-103, issn 0740-817XArticle
Making Architecture Visible to Improve Flow Management in Lean Software Development : LEAN SOFTWARE DEVELOPMENTNORD, Robert L; OZKAYA, Ipek; SANGWAN, Raghvinder S et al.IEEE software. 2012, Vol 29, Num 5, pp 33-39, issn 0740-7459, 7 p.Article
A structural methodology for managing manufacturing lead times in make-to-order companiesKINGSMAN, B. G; TATSIOPOULOS, I. P; HENDRY, L. C et al.European journal of operational research. 1989, Vol 40, Num 2, pp 196-209, issn 0377-2217, 14 p.Article
Evaluation of the number of rehandles in container yardsKAP HWAN KIM.Computers & industrial engineering. 1997, Vol 32, Num 4, pp 701-711, issn 0360-8352Article
The impact of stochastic lead time reduction on inventory cost under order crossoverHAYYA, Jack C; HARRISON, Terry P; HE, X. James et al.European journal of operational research. 2011, Vol 211, Num 2, pp 274-281, issn 0377-2217, 8 p.Article
Random lead times and expedited orders in (Q, r) inventory systemsBOOKBINDER, J. H; CAKANYILDIRIM, M.European journal of operational research. 1999, Vol 115, Num 2, pp 300-313, issn 0377-2217Article
Simple expressions for finding recovery system inventory control parameter valuesKIESMÜLLER, G. P; MINNER, S.The Journal of the Operational Research Society. 2003, Vol 54, Num 1, pp 83-88, issn 0160-5682, 6 p.Article
Stochastic inventory model with controllable lead timeCHING-JONG LIAO; CHIH-HSIUNG SHYU.International journal of systems science. 1991, Vol 22, Num 11, pp 2347-2354, issn 0020-7721Article
Improved inventory models with service level and lead timeCHU, Peter; YANG, Kuo-Lung; CHEN, Patrick S et al.Computers & operations research. 2005, Vol 32, Num 2, pp 285-296, issn 0305-0548, 12 p.Article
A Bayesian learning procedure for the (S, Q) inventory policyBOENDER, C. G. E; RINNOOY KAN, A. H. G.Statistica neerlandica. 1990, Vol 44, Num 3, pp 105-114, issn 0039-0402, 10 p.Article
Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reductionCHANG, Hung-Chi; OUYANG, Liang-Yuh; WU, Kun-Shan et al.European journal of operational research. 2006, Vol 170, Num 2, pp 481-495, issn 0377-2217, 15 p.Article
An alternative to safety stock policies for multi-level rolling schedule MRP problems : Supply chain management and advanced planningDELLAERT, N; JEUNET, J.European journal of operational research. 2005, Vol 163, Num 3, pp 751-768, issn 0377-2217, 18 p.Article
Optimal ordering policies with two types of randomized lead timesKAIO, N; OSAKI, S.Computers & mathematics with applications (1987). 1990, Vol 19, Num 11, pp 43-52, issn 0898-1221, 10 p.Article
On the single item multi-supplier system with variable lead-time, price-quantity discount, and resource constraintsCHANG, Ching-Ter; CHIN, Chen-Lung; LIN, Mei-Feng et al.Applied mathematics and computation. 2006, Vol 182, Num 1, pp 89-97, issn 0096-3003, 9 p.Article
Ganzheitliche Neugestaltung der Werkzeugmaschinenmontage : Wettbewerbsfähigkeit durch Verringerung der Durchlaufzeiten verbessern = The whole new design of machine tool assembly: competitivity improvement in reducing the lead timeEVERSHEIM, W; VON PATOW, C; LANGE-STALINSKI, T et al.VDI-Z. 1999, Vol 141, Num 9-10, pp 43-45, issn 0042-1766Article
Mixture inventory model with backorders and lost sales for variable lead timeOUYANG, L.-Y; YEH, N.-C; WU, K.-S et al.The Journal of the Operational Research Society. 1996, Vol 47, Num 6, pp 829-832, issn 0160-5682Article
Scheduling system for multi-process productionFUKUSHIMA, K; HO, K; CHIU, C. T et al.Computers & industrial engineering. 1996, Vol 31, Num 3-4, pp 619-623, issn 0360-8352Conference Paper
The impact of leadtime and years of competitive rivalry on pioneer market share advantagesHUFF, L. C; ROBINSON, W. T.Management science. 1994, Vol 40, Num 10, pp 1370-1377, issn 0025-1909Article
An (S-1,S) inventory system with emergency ordersKAMRAM MOINDZADEH; SCHMIDT, C. P.Operations research. 1991, Vol 39, Num 2, pp 308-321, issn 0030-364XArticle
The prehospital 12-lead electrocardiogram's effect on time to initiation of reperfusion therapy : a systematic review and meta-analysis of existing literatureBRAINARD, Andrew Han; RAYNOVICH, William; TANDBERG, Dan et al.The American journal of emergency medicine. 2005, Vol 23, Num 3, pp 351-356, issn 0735-6757, 6 p.Article
Parallel machine scheduling with splitting jobsWENXUN XING; JIAWEI ZHANG.Discrete applied mathematics. 2000, Vol 103, Num 1-3, pp 259-269, issn 0166-218XArticle
Prozessorientierte Auftragsabwicklung für den Airbus = Process oriented order management for the AirbusTIJSSEN, H; ISENBERG, R; BRANKAMP, K et al.VDI-Z. 1996, Vol 138, Num 5, pp 60-63, issn 0042-1766Article
On production batches, transfer batches, and lead timesBENJAAFAR, S.IIE transactions. 1996, Vol 28, Num 5, pp 357-362, issn 0740-817XArticle
Job release : part of a hierarchical system to manage manufacturing lead times in make-to-order companiesHENDRY, L. C; KINGSMAN, B. G.The Journal of the Operational Research Society. 1991, Vol 42, Num 10, pp 871-883, issn 0160-5682Article
Widening the scope of software product lines: From variation to compositionVAN OMMEFING, Rob; BOSCH, Jan.Lecture notes in computer science. 2002, pp 328-347, issn 0302-9743, isbn 3-540-43985-4, 20 p.Conference Paper