Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("OPERATIONAL RESEARCH")

Filter

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 13877

  • Page / 556
Export

Selection :

  • and

Strands of practice in OR. The practitioner's dilemmaCORBETT, C; OVERMEER, W; VAN WASSENHOVE, L et al.1995, 27 p.Book

Shallow, deep and very deep cuts in the analytic center cutting plane method = Détermination de la coupe par la méthode des plans coupants basée sur les centres analytiquesGOFFIN, J. L; VIAL, J. P.1996, 18 p.Book

ON A PERIODIC MAINTENANCE PROBLEMWEI WD; LIU CL.1983; OPERATIONS RESEARCH LETTERS; ISSN 507679; NLD; DA. 1983; VOL. 2; NO 2; PP. 90-93; BIBL. 4 REF.Article

METHODES APPROCHEES DE PROGRAMMATION DISCRETEKORBUT AA; FINKEL'SHTEJN YU YU.1983; IZVESTIJA AKEDEMII NAUK SSSR. TEHNICESKAJA KIBERNETIKA; ISSN 0002-3388; SUN; DA. 1983; NO 1; PP. 165-176; BIBL. 81 REF.Article

APPROXIMATE AGGREGATION OF PRODUCT DATAAXSAEPATER S; JOENSSON H; THORSTENSON A et al.1983; ENGINEERING COSTS AND PRODUCTION ECONOMICS; ISSN 0167-188X; NLD; DA. 1983; VOL. 7; NO 2; PP. 119-126; BIBL. 6 REF.Article

CONSISTENT LINK FLOW ESTIMATION FROM COUNTSVAN ZUYLEN HJ; BRANSTON DM.1982; TRANSPORTATION RESEARCH. PART B: METHODOLOGICAL; ISSN 0191-2615; GBR; DA. 1982; VOL. 16; NO 6; PP. 473-476; BIBL. 2 REF.Article

DOMAINS OF STRUCTURAL STABILITY FOR MINIMAL-COST DISCRETE FLOWS WITH REFERENCE TO THE HIERARCHICAL CENTRAL-PLACE MODELSSONIS M.1982; ENVIRON. PLANN. A; ISSN 0308-518X; GBR; DA. 1982; VOL. 14; NO 4; PP. 455-469; BIBL. 10 REF.Article

SIMULATION IN 1981CROOKES JG.1982; EUR. J. OPER. RES.; ISSN 0377-2217; NLD; DA. 1982; VOL. 9; NO 1; PP. 1-7; BIBL. 11 REF.Article

PRIBLIZNA METODA OPTIMALIZACE ROZMISTOVAMI OBJEKTU VE DVOUSTUPNOVE SITI = UNE METHODE D'APPROXIMATION POUR LES PROBLEMES DE LOCALISATION A DEUX ETAPESMARTINEC I.1982; EKON-MAT. DOZ.; ISSN 0013-3027; CSK; DA. 1982; VOL. 18; NO 3; PP. 285-304; ABS. ENG; BIBL. 8 REF.Article

VON DER VERANTWORTUNG EINES MATHEMATIKERS BEI PROGNOSEBERECHNUNGEN = REPONSE D'UN MATHEMATICIEN AU PROBLEME DU CALCUL DE PRONOSTICSNEUBURGER E.1982; BLAETTER - DEUTSCHE GESELLSCHAFT FUER VERSICHERUNGSMATHEMATIK; ISSN 0012-0200; DEU; DA. 1982; VOL. 15; NO 3; PP. 319-344; ABS. ENG; BIBL. 4 REF.Article

BOUNDS ON THE RELIABILITY POLYNOMIAL FOR SHELLABLE INDEPENDENCE SYSTEMSBALL MO; PROVAN JS.1982; SIAM J. ALGEBR. DISCRETE METHODS; ISSN 0196-5212; USA; DA. 1982; VOL. 3; NO 2; PP. 166-181; BIBL. 29 REF.Article

ESTABLISHING REORDER POINTS IN THE (S, C, S) COORDINATED CONTROL SYSTEM UNDER COMPOUND POISSON DEMANDSILVER EA.1981; INT. J. PROD. RES.; ISSN 0020-7543; GBR; DA. 1981; VOL. 19; NO 6; PP. 743-750; ABS. FRE/GER; BIBL. 6 REF.Article

NON-TECHNICAL FACTORS IN THE SUCCESS AND FAILURE OF OPERATIONAL RESEARCHROBERTS J.1981; OPERATIONAL RESEARCH '81. OR 81. IFORS 81. INTERNATIONAL CONFERENCE ON OPERATIONAL RESEARCH. 9/1981/HAMBURG; NLD/USA/GBR; AMSTERDAM; NEW YORK; OXFORD: NORTH HOLLAND; DA. 1981; PP. 105-117; ABS. FRE; BIBL. 6 REF.Conference Paper

O.R. IN THE NATIONAL COAL BOARD = LA RECHERCHE OPERATIONNELLE DANS LA COMMISSION NATIONALE DU CHARBONTURNER IR.1981; J. OPER. RES. SOC.; ISSN 0160-5682; GBR; DA. 1981; VOL. 32; NO 9; PP. 747-753Article

THE EXISTENCE OF AN EQUILIBRIUM SOLUTION TO THE TRAFFIC ASSIGNMENT PROBLEM WHEN THERE ARE JUNCTION INTERACTIONSSMITH MJ.1981; TRANSP. RES., PART B: METHODOL.; ISSN 0191-2615; GBR; DA. 1981; VOL. 15; NO 6; PP. 443-451; BIBL. 5 REF.Article

THE PROJECTIVITY OF Y-GAMESYAMASAKI Y.1981; PUBL. RES. INST. MATH. SCI.; JPN; DA. 1981; VOL. 17; NO 1; PP. 245-248; BIBL. 6 REF.Article

MULTISTATE RELIABILITY MODELSGRIFFITH WS.1980; J. APPL. PROBAB.; ISSN 0021-9002; GBR; DA. 1980; VOL. 17; NO 3; PP. 735-744; BIBL. 4 REF.Article

ORDERED FLOW SHOP PROBLEMS WITH NO IN-PROCESS WAITING: FURTHER RESULTSPANWALKAR SS; WOOLLAM CR.1980; J. OPER. RES. SOC.; ISSN 0160-5682; GBR; DA. 1980; VOL. 31; NO 11; PP. 1039-1043; BIBL. 17 REF.Article

PRIORITY DISPATCHING RULES IN JOB SHOPS WITH ASSEMBLY OPERATIONS AND RANDOM DELAYSSCULLI D.1980; OMEGA; GBR; DA. 1980; VOL. 8; NO 2; PP. 227-234; BIBL. 10 REF.Article

RISIKOTHEORETISCHE ASPEKTE VON SELBSTBETEILIGUNGEN = ASPECTS DE LA THEORIE DU RISQUE DANS LES DEDUCTIBLES DANS LES MODELES D'INDEMNISATIONSTERK HP.1980; BL. DTSCH. GESELLSCH. VERSICHER.-MATH.; DEU; DA. 1980; VOL. 14; NO 3; PP. 413-426; ABS. ENG; BIBL. 27 REF.Article

A NOTE ON THE OPTIMAL REPLACEMENT TIME OF DAMAGED DEVICESZUCKERMAN D.1980; NAV. RES. LOGIST. Q.; ISSN 0028-1441; USA; DA. 1980; VOL. 27; NO 3; PP. 521-524; BIBL. 3 REF.Article

A SOLVABLE CYCLIC SCHEDULING PROBLEM WITH SERIAL PRECEDENCE STRUCTUREGARFINKEL RS; PLOTNICKI WJ.1980; OPER. RES.; ISSN 0030-364X; USA; DA. 1980; VOL. 28; NO 5; PP. 1236-1240; BIBL. 2 REF.Article

DUALITY PRINCIPLES AND THE ALGEBRAIC TRANSPORTATION PROBLEMZIMMERMANN U.1979; SER. INTERNATION. ANAL. NUMER.; CHE; DA. 1979; VOL. 46; PP. 234-255; BIBL. 13 REF.Conference Paper

INSURANCE ECONOMICSBOHMAN H.1979; SCAND. ACTU. J.; SWE; DA. 1979; NO 2-3; PP. 57-74Article

ON N/1/F DYNAMIC DETERMINISTIC PROBLEMSRAMESH CHANDRA.1979; NAV. RES. LOGIST. QUART.; USA; DA. 1979; VOL. 26; NO 3; PP. 537-544; BIBL. 8 REF.Article

  • Page / 556