Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("PEAK POWER")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 1391

  • Page / 56
Export

Selection :

  • and

STEAM GENERATOR FOR A MID-PEAK 500 MW POWER PLANT UNITPARSHIN AA; LEVCHENKO GI; KHRISTICH LM et al.1978; ENERGO-MASHINOSTR.; S.S.S.R.; DA. 1978; NO 5; PP. 1-4; BIBL. 2 REF.Article

MANOEVRIERFAEHIGKEIT VON SPITZENKRAFTWERKEN. = PEAK POWER PLANT MANEUVERABILITY = MANOEUVRABILITE DES CENTRALES DE POINTESSCHRAMM G.1978; ENERGIETECHNIK; DTSCH.; DA. 1978; VOL. 28; NO 4; PP. 145-149; BIBL. 1 REF.Article

WAERMEKRAFTPROZESSE FUER WASSERSTOFF-SPITZENLAST-KRAFTWERKE = PROCESSUS DE PRODUCTION COMBINEE CHALEUR-FORCE PAR DES CENTRALES UTILISANT L'HYDROGENE POUR COUVRIR LES POINTES DE CONSOMMATIONWOJKOWSKY H; SCHNURNBERGER W; STERNFELD HJ et al.1982; BRENNSTOFF-WAERME-KRAFT; ISSN 0006-9612; DEU; DA. 1982; VOL. 34; NO 7; PP. 351-354; BIBL. 8 REF.Article

BREVET 2.295.537 (A1) (7538387). - 15 DECEMBRE 1975. PROCEDE D'ADAPTATION D'UNE SOURCE DE CHALEUR ET D'UNE MACHINE THERMIQUE PAR STOCKAGE TEMPORAIRE DE CHALEUR.sdPatent

OPTIMIZING OF STEAM TURBINE POWER PLANTS1976; IN: KOMPLEKSN. OPTIMIZATSIYA TEPLOSILOVYKH SIST.; NOVOSIBIRSK; NAUKA; DA. 1976; PP. 119-148; BIBL. DISSEM.Book Chapter

PREHEATING OF PEAK UNITSMALEWICZ W.1976; ENERGETYKA; POLSKA; DA. 1976; VOL. 30; NO 7-8; PP. 270-272Article

BREVET CENTRALE A PRODUCTION DE CHALEUR1978; ; FRA; DA. 1978-09-15; FR/A1/2.377.524; DEP.77-17977/1977-06-07; PR. AU/205-77/1977-01-14Patent

PLUGGING ELECTRICAL SYSTEM DATA INTO THE MECHANICAL DESIGN.MCCARTHY TM.1976; HEATG PIPG AIR CONDITIONG; U.S.A.; DA. 1976; VOL. 48; NO 10; PP. 48-94 (3P.)Article

EAST GERMANY'S NEW PLANT ADDS TO PEAKING CAPACITY1982; INT. WATER POWER DAM CONSTR.; ISSN 0306-400X; GBR; DA. 1982; VOL. 34; NO 3; PP. 38Article

INCREASE OF STEAM GENERATORS AND THERMAL POWER PLANT UNIT MANEUVERABILITY FOR PEAK LOAD FACINGKOVALEV AP.1980; IZVEST. VYSSH. UCHEBN. ZAVED., ENERGET.; BYS; DA. 1980; NO 1; PP. 38-46; BIBL. 9 REF.Article

LARGE SCALE ENERGY STORAGE: BATTERIES FOR TRANSPORT AND STATIONARY APPLICATIONSMCGEEHIN P; JENSEN J.1979; I.E.E. CONF. PUBL.; GBR; DA. 1979; NO 171; PP. 190-194; BIBL. 7 REF.Conference Paper

RESULTS OF POWER PLANT OPERATION EXPERIMENTAL VERIFICATION IN PEAK CONDITIONSKURITSYN VS; MOISEEV LA.1979; ENERGET. I ELEKTRIFIK.; UKR; DA. 1979; NO 2; PP. 14-15Article

OPTIMAL INITIAL PARAMETERS OF PEAK STEAM TURBINE SETSAMINOV RZ; KHRUSTALEV VA; CHERTYKOV AM et al.1977; IZVEST. VYSSH. UCHEBN. ZAVED., ENERGET.; S.S.S.R.; DA. 1977; VOL. 20; NO 9; PP. 50-56; BIBL. 10 REF.Article

WAERMESPEICHERUNG IN DER RUECKLAUFLEITUNG VON FERNWAERMESYSTEMEN = THERMAL STORAGE IN RETURN PIPELINE OF DISTRICT HEATING NETWORK = ACCUMULATION DE LA CHALEUR DANS LA CANALISATION DE RETOUR DES SYSTEMES DE CHAUFFAGE A LONGUE DISTANCESZABO I; ZSEBIK A.1981; ENERGIETECHNIK; ISSN 0013-7421; DDR; DA. 1981; VOL. 31; NO 5; PP. 190-194Article

MODULARISED GAS TURBINE POWER PLANTSHEADBERRY DM; MILLER RM; CHALLIS LA et al.1980; ENGINEERING IN THE 80'S. ENGINEERING CONFERENCE 1980/1980/ADELAIDE; AUS; BARTON: INSTITUTION OF ENGINEERS, AUSTRALIA; DA. 1980; PP. 161-167; BIBL. 13 REF.Conference Paper

EXPERIENCE GAINED WITH GT-100 PEAK GAS TURBINE OPERATION IN SOVIETIC POWER PLANTSOL'KHOVSKIJ GG; BODROV IS; KIRSH AK et al.1980; PROM. TEPLOTEH.; UKR; DA. 1980; VOL. 2; NO 6; PP. 108-116; ABS. ENG; BIBL. 1 REF.Article

IFR TURBINE-OLD AERO-ENGINE COMBINATION AS A POWER TURBINEJADEJA HT.1979; RES. AND INDUSTRY; IND; DA. 1979; VOL. 24; NO 3; PP. 152-157; BIBL. 10 REF.Article

UTILIZING THE COGENERATION SYSTEM TO CONTROL PURCHASED POWER DEMANDWILSON WB; KOVACIK JM.1979; T.A.P.P.I.; USA; DA. 1979; VOL. 62; NO 11; PP. 75-78Article

THE PEAK LOAD PROBLEM WITH STORAGE TECHNOLOGYASBURY JG; MUELLER RO.1978; RESOURCES AND ENERGY; NLD; DA. 1978; VOL. 1; NO 4; PP. 325-337; BIBL. 9 REF.Article

THE INFLUENCE OF INSULATION ON THE COOLING OF STEAM TURBINE HOUSINGS.GUTOROV VF; SAVENKOVA IA; LAZARENKO IS et al.1977; SOVIET POWER ENGNG; U.S.A.; DA. 1977; VOL. 6; NO 3; PP. 160-163; BIBL. 3 REF.Article

CONTRIBUTION OF A GAS/STEAM POWER PLANT TO ENERGY PEAK SHAVINGLYUBIMOV AA; OZEROV VI.1977; ENERGO-MASHINOSTR.; S.S.S.R.; DA. 1977; NO 5; PP. 7-9; BIBL. 3 REF.Article

STUDY OF THE T6MP-324 POWER PLANT STEAM GENERATOR IN OVER LOADING CONDITIONS OBTAINED BY THE HIGH PRESSURE REHEATER SHUT UPMITOR VV; ZYKOV SA; KONASHEV SL et al.1977; ENERGO-MASHINOSTR.; S.S.S.R.; DA. 1977; NO 5; PP. 1-4Article

AERO ENGINES DOMINATE CEGB PEAKING PROGRAMME.HURST JN.1977; ENERGY INTERNATION.; U.S.A.; DA. 1977; VOL. 14; NO 3; PP. 17-19Article

DAS LUFTSPEICHER-GASTURBINENKRAFTWERK HUNTORF DER NORDWESTDEUTSCHE KRAFTWERKE AG. = THE HUNTORF AIR-STORAGE GAS TURBINE POWER PLANT = LA CENTRALE DE HUNTORF A TURBINE A GAZ ET A ACCUMULATION D'AIR COMPRIMEWEBER O.1976; MOTORTECH. Z.; DTSCH.; DA. 1976; VOL. 37; NO 6; PP. 235-246; ABS. ANGL.; BIBL. 1 REF.Article

THE DESIGN OF A PEAK STORAGE GAS TURBINE POWER PLANTSGUNDLACH W; TALAR W.1976; GOSPOD. PALIW. ENERG.; POLSKA; DA. 1976; VOL. 24; NO 6; PP. 5-8; ABS. ANGL. RUSSE; BIBL. 20 REF.Article

  • Page / 56