au.\*:("PENMAN ADM")
Results 1 to 8 of 8
Selection :
THE FAILURE OF TETON DAM.PENMAN ADM.1977; GROUND ENGNG; G.B.; DA. 1977; VOL. 10; NO 6; PP. 18-27; BIBL. 34 REF.; 6 ILL.Article
INSTRUMENTATION REQUIREMENTS FOR EARTH AND ROCKFILL DAMS = LES INSTRUMENTS NECESSAIRES AUX BARRAGES EN TERRE ET D'ENROCHEMENTPENMAN ADM.1982; GEOTECHNICAL PROBLEMS AND PRACTICE OF DAM ENGINEERING. PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM HELD AT ASIAN INSTITUTE OF TECHNOLOGY/1980/BANGKOK; NLD; ROTTERDAM: A. A. BALKEMA; DA. 1982; PP. 183-209; BIBL. 1 P.; ILL.Conference Paper
DESIGN PARAMETERS IN GEOTECHNICAL ENGINEERING = LES PARAMETRES DE PLANS D'OUVRAGE EN GEOTECHNIQUEPENMAN ADM.1980; GROUND ENGNG; ISSN 0017-4653; GBR; DA. 1980; VOL. 13; NO 3; PP. 22-28; 6 P.; BIBL. 14 REF.; ILL.Conference Paper
THE BEHAVIOUR OF ROCKFILL DAMSPENMAN ADM.1978; GEOTECH. ENGNG; THA; DA. 1978; VOL. 9; NO 2; PP. 105-122; BIBL. 2 P.; 10 ILL.Article
EARTH PRESSURES MEASURED WITH HYDRAULIC PIEZOMETERS.PENMAN ADM.1976; GROUND ENGNG; G.B.; DA. 1976; VOL. 9; NO 8; PP. 17-23; BIBL. 22 REF.; 17 ILL.Article
ICOLD IN THE ROUND - REPORT ON THE MEXICO CONGRESS.PENMAN ADM.1976; GROUND ENGNG; G.B.; 1976, VOL. 9, NUM. 0005, P. 41 A 44Serial Issue
MEASURING EARTH PRESSURES IN EMBANKMENT DAMSPENMAN ADM.1979; WAT. POWER DAM CONSTR.; GBR; DA. 1979; VOL. 31; NO 6; PP. 29-34; BIBL. 13 REF.Article
AN IMPROVED HORIZONTAL PLATE GAUGE = AMELIORATION D'UNE JAUGE A PLAQUE HORIZONTALEPENMAN ADM; CHARLES JA.1982; GEOTECHNIQUE; ISSN 0016-8505; GBR; DA. 1982; VOL. 32; NO 3; PP. 278-282; BIBL. 4 REF.Article