Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("PROCESS STEAM")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 201

  • Page / 9
Export

Selection :

  • and

STEAM: GENERATION, USE AND DISTRIBUTIONTEWARI GC.1979; CHEM. ENGNG WORLD; IND; DA. 1979; VOL. 14; NO 9; PP. 47-57Article

STEAM HEAT FOR OPTIMUM EFFICIENCYO'NEILL E.1978; HEATG PIPG AIR CONDITIONG; USA; DA. 1978; VOL. 50; NO 11; PP. 81-83Article

MAKING BETTER USE OF YOUR PROCESS STEAM SUPPLIESCHALLIS H.1983; PROCESS ENGINEERING; ISSN 0370-1859; GBR; DA. 1983; VOL. 64; NO 4; PP. 43-45; 2 P.Article

SIZING AND SELECTION OF AUXILIARY BOILERS FOR USE IN AUXILIARY STEAM SYSTEMSFEIGENBAUM TC; FIALA P.1981; PROCEEDINGS OF THE AMERICAN POWER CONFERENCE; ISSN 0097-2126; USA; DA. 1981; VOL. 43; PP. 236-243; BIBL. 2 REF.Conference Paper

PROCESS HEATING. IT STILL BOILS DOWN TO STEAMQUICK J.1980; HEAT. AIR COND. J.; ISSN 0307-7950; GBR; DA. 1980; PP. 22-30; 6 P.Article

PIPELINE DESUPERHEATING - A PRACTICAL APPROACH.GOLDSPINK K.1978; PROCESSING; G.B.; DA. 1978; VOL. 24; NO 2; PP. 37Article

CONDENSATE RECOVERY SYSTEMSMONROE ES.1983; CHEMICAL ENGINEERING (NEW YORK); ISSN 0009-2460; USA; DA. 1983; VOL. 90; NO 12; PP. 117-120; BIBL. 3 REF.Article

OPTIMIERUNG DER DAMPF- UND KONDENSATWIRTSCHAFT = OPTIMIZATION OF STEAM AND CONDENSATE ECONOMY = OPTIMISATION DE L'ECONOMIE DE LA VAPEUR D'EAU ET DU CONDENSATGROENEVELD W.1981; VDI-BER.; ISSN 0083-5560; DEU; DA. 1981; NO 44; PP. 109-113Conference Paper

CONDENSATE CONTROLLER THROTTLES BACH ON STEAM CONSUMPTION1979; PROCESSING; GBR; DA. 1979; VOL. 25; NO 1; PP. 45-46Article

HEAT PUMPS FOR THE PRODUCTION OF PROCESS STEAMKEW PA.1982; HEATING & VENTILATING ENGINEER (1976); ISSN 0260-1338; GBR; DA. 1982; VOL. 56; NO 647; PP. 13-17; BIBL. 10 REF.Article

KEEPING A COOL HEAD OF STEAM1982; ENERGY MANAGER; ISSN 0142-078X; GBR; DA. 1982; VOL. 5; NO 5; PP. 25-33; 5 P.Article

REDUCED ENERGY LOSSES IN MULTI-PRESSURE LEVEL STEAM SYSTEMSBECKINGHAM PA.1979; CHEM. ENG. AUST.; AUS; DA. 1979; VOL. 4; NO 1; PP. 27-30Article

LE CONTROLE DES FUITES DE VAPEUR SUR LES PURGEURS = STEAM PEAK MONITORING IN PET COCKSCENTOL E.1982; TECH. MOD.; ISSN 0040-1250; FRA; DA. 1982; VOL. 74; NO 7-8; PP. 21-22Article

STUDIES ON THE SORPTION OF ELEMENTAL MERCURY VAPOR BY SOILSFANG SC.1981; ARCH. ENVIRON. CONTAM. TOXICOL.; ISSN 0090-4341; USA; DA. 1981; VOL. 10; NO 2; PP. 193-201; BIBL. 12 REF.Article

OPTIMUM STEAM AND POWER GENERATIONLASPISA RJ; STACY GD; SOCHAN HM et al.1978; ENERGY'78. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS. REGION 5. ANNUAL CONFERENCE/1978/TULSA OK; USA; NEW YORK: IEEE; DA. 1978; PP. 64-67Conference Paper

DER TEMPLIFIER. EINE WAERMEPUMPE FUER DIE INDUSTRIE. = THE "TEMPLIFIER". A HEAT PUMPS FOR THE INDUSTRY = L'"AMPLIFICATEUR DE TEMPERATURE". UNE POMPE DE CHALEUR POUR L'INDUSTRIEBACHMANN D.1977; INDUSTR.-ANZ.; DTSCH.; DA. 1977; VOL. 99; NO 3; PP. 44-47; BIBL. 2 REF.Article

STEAM GENERATION: FOSSIL-FIRED SYSTEMS UTILITY BOILERS, INDUSTRIAL BOILERS, BOILER AUXILIARIES, NUCLEAR SYSTEMS BOILING WATER, PRESSURIZED WATER, IN-CORE FUEL MANAGEMENT, STEAM-CYCLE SYSTEMS, CONDENSATE/FEEDWATER, CIRCULATING WATER, WATER TREATMENT1982; POWER; ISSN 0032-5929; USA; DA. 1982; VOL. 126; NO 4; PP. 161-240Article

MONEY DOWN THE DRAINWILKINSON G.1981; ENERGY MANAGER; ISSN 0142-078X; GBR; DA. 1981; VOL. 4; NO 9; PP. 28-30; 2 P.Article

ECONOMIC RECOVERY OF STEAMDARBY P.1983; ENERGY MANAGER; ISSN 0142-078X; GBR; DA. 1983; VOL. 6; NO 5; PP. 42-43Article

PROCESS STEAM LINE FROM THE NUCLEAR POWER STATION TO CARDBOARD INDUSTRY AT NIEDERGOESGENGAUTSCHI E.1981; CONFERENCE ON WASTE HEAT MANAGEMENT AND UTILIZATION. 3/1981/MIAMI BEACH FL; USA; CORAL GABLES: MECHANICAL ENGINEERING DEPARTMENT OF THE UNIVERSITY OF MIAMI; DA. 1981; PP. IX.A.196-IX.A.197Conference Paper

LE PROCEDE MIXTE DE RECOMPRESSION: UN MOYEN NOUVEAU POUR REDUIRE LES DEPENSES GLOBALES D'ENERGIE DANS LES PROCESS INCLUANT UN EVAPORATEUR = THE MIXED RECOMPRESSION PROCESS: A NEW MEANS FOR REDUCING GLOBAL ENERGY COST IN EVAPORATOR-FITTED PROCESSESCIBOIT J.1981; IND. ALIMENT. AGRIC.; ISSN 0019-9311; FRA; DA. 1981; VOL. 98; NO 6; PP. 477-489; ABS. ENGArticle

THE ENGINEERING OF RELIABILITY INTO WASTE HEAT BOILER SYSTEMSHINCHLEY P.1979; PROC. INSTIT. MECH. ENGRS; GBR; DA. 1979-03; VOL. 193; PP. 1-14; BIBL. 13 REF.Article

LES PURGEURS = STEAM TRAPS1979; MAINTENANCE; FRA; DA. 1979; NO 97; PP. 23-31Article

QUELQUES CONSIDERATIONS SUR L'UTILISATION DE LA VAPEUR DANS L'INDUSTRIE = SOME REMARKS ON STEAM UTILIZATION IN THE INDUSTRYDELSOL C; THOMAS F.1979; BOIS; FRA; DA. 1979; VOL. 10; NO 7-8; PP. 27-29Article

COGENERATION: THE POTENTIAL AND THE REALITY IN A MIDWESTERN UTILITY SERVICE AREASTIPANUK DM; HELLEN WJ.1978; CONFERENCE ON WASTE HEAT MANAGEMENT AND UTILIZATION. 2/1978-12-04/MIAMI BEACH; USA; CORAL GABLER: UNIVERSITY OF MIAMI; DA. 1978; PP. VII.A.13-VII.A.26Conference Paper

  • Page / 9