Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("REPLACEMENT PROBLEM")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 755

  • Page / 31
Export

Selection :

  • and

ORDERING POLICIES WITH TWO TYPES OF LEAD TIMES.KAIO N; OSAKI S.1977; MICROELECTRON. AND RELIABIL.; G.B.; DA. 1977; VOL. 16; NO 3; PP. 225-229; BIBL. 10 REF.Article

A NOTE ON THE OPTIMAL REPLACEMENT TIME OF DAMAGED DEVICESZUCKERMAN D.1980; NAV. RES. LOGIST. Q.; ISSN 0028-1441; USA; DA. 1980; VOL. 27; NO 3; PP. 521-524; BIBL. 3 REF.Article

COMPARISON OF AGE, BLOCK, AND FAILURE REPLACEMENT POLICIES.BERG M; EPSTEIN B.1978; I.E.E.E. TRANS. RELIABIL.; USA; DA. 1978; VOL. 27; NO 1; PP. 25-30; BIBL. 3 REF.Article

A GENERAL PREVENTIVE MAINTENANCE POLICY.BEICHELT F.1976; MATH. OPER.-FORSCH. STATIST.; DTSCH.; DA. 1976; VOL. 7; NO 6; PP. 927-932; ABS. RUSSE ANGL.; BIBL. 4 REF.Article

THE DECISION TO REPLACE A UNIT EARLY OR LATE IN AN AGE REPLACEMENT PROBLEMNAKAGAWA T.1979; MICROELECTRON. AND RELIABIL.; GBR; DA. 1979; VOL. 19; NO 3; PP. 265-267; BIBL. 5 REF.Article

ANALYSIS OF A SYSTEM WITH MINIMAL REPAIR AND ITS APPLICATION TO REPLACEMENT POLICYNAKAGAWA T; KOWADA M.1983; EUROPEAN JOURNAL OF OPERATIONAL RESEARCH; ISSN 0377-2217; NLD; DA. 1983; VOL. 12; NO 2; PP. 176-182; BIBL. 9 REF.Article

REPAIR LIMIT POLICIES FOR VEHICLE REPLACEMENTLOVE CE; RODGER A; BLAZENKO G et al.1982; INFOR (OTTAWA); ISSN 0315-5986; CAN; DA. 1982; VOL. 20; NO 3; PP. 226-236; ABS. FRE; BIBL. 7 REF.Article

A NOTE ON BLOCK REPLACEMENT POLICYMURTHY DNP.1982; J. OPER. RES. SOC.; ISSN 0160-5682; GBR; DA. 1982; VOL. 33; NO 5; PP. 481-483; BIBL. 3 REF.Article

A REPLACEMENT SCHEDULE FOR MULTICOMPONENT LIFE-LIMITED PARTSEPSTEIN S; WILAMOWSKY Y.1982; NAVAL RESEARCH LOGISTICS QUARTERLY; ISSN 0028-1441; USA; DA. 1982; VOL. 29; NO 4; PP. 685-692; BIBL. 7 REF.Article

OPTIMAL REPLACEMENT OF PARTS HAVING OBSERVABLE CORRELATED STAGES OF DETERIORATIONSHAW L; HSU CL; TYAN SG et al.1980; NAV. RES. LOGIST. Q.; ISSN 0028-1441; USA; DA. 1980; VOL. 27; NO 3; PP. 359-373; BIBL. 11 REF.Article

OPTIMIZING THE EQUIPMENT REPLACEMENT POLICY IN A PRODUCTION LINESETHIA PC.1979; J. INSTIT. ENGRS (INDIA), MECH. ENGNG DIV.; IND; DA. 1979; VOL. 59; NO 6; PP. 270-273; BIBL. 5 REF.Article

REFINED ASYMPTOTIC COSTS FOR RENEWAL REWARD PROCESSES.CHRISTER AH.1978; J. OPERAT. RES. SOC.; GBR; DA. 1978; VOL. 29; NO 6; PP. 577-583; BIBL. 6 REF.Article

DISCRETE TIME AGE REPLACEMENT POLICIES.NAKAGAWA T; OSAKI S.1977; OPER. RES. QUART.; G.B.; DA. 1977; VOL. 28; NO 4I; PP. 881-885; BIBL. 6 REF.Article

OPTIMAL ORDERING AND REPLACEMENT FOR A 1-UNIT SYSTEM.MINE H; KAWAI H.1977; I.E.E.E. TRANS. RELIABIL.; U.S.A.; DA. 1977; VOL. 26; NO 4; PP. 273-276; BIBL. 3 REF.Article

THE EFFECT OF ALTERNATIVE COST CRITERIA ON OPTIMAL REPLACEMENTANSELL J; BENDELL A.1982; ARTS. 7. ADVANCES IN RELIABILITY TECHNOLOGY SYMPOSIUM. 7/1982-04-14/BRADFORD; GBR; WANDSWORTH: IMPR. CHAMELON PRESS; DA. 1982; PP. 1B.1.1-1B.1.11; BIBL. 16 REF.Conference Paper

A MARGINAL COST ANALYSIS FOR AN AGE REPLACEMENT POLICY WITH MINIMAL REPAIRBERG M; CLEROUX R.1982; INFOR (OTTAWA); ISSN 0315-5986; CAN; DA. 1982; VOL. 20; NO 3; PP. 258-263; ABS. FRE; BIBL. 3 REF.Article

A NOTE ON A MODIFIED BLOCK REPLACEMENT POLICY FOR UNITS WITH INCREASING MARGINAL RUNNING COSTSBERG M; EPSTEIN B.1979; NAV. RES. LOGIST. QUART.; USA; DA. 1979; VOL. 26; NO 1; PP. 157-160; BIBL. 8 REF.Article

APPROXIMATE CALCULATION OF BLOCK REPLACEMENT WITH WEIBULL FAILURE TIMESNAKAGAWA T; YASUI K.1978; I.E.E.E. TRANS. RELIABIL.; USA; DA. 1978; VOL. 27; NO 4; PP. 268-269; BIBL. 2 REF.Article

A REPLACEMENT POLICY BASED ON LIMITS FOR THE REPAIR COST RATEBEICHELT F.1982; IEEE TRANSACTIONS ON RELIABILITY; ISSN 0018-9529; USA; DA. 1982; VOL. 31; NO 4; PP. 401-403; BIBL. 8 REF.Article

NESTED RENEWAL PROCESSESANSELL J; BENDELL A; HUMBLE S et al.1980; ADV. APPL. PROBAB.; ISSN 0001-8678; GBR; DA. 1980; VOL. 12; NO 4; PP. 880-892; BIBL. 7 REF.Article

OPTIMUM AGE REPLACEMENT POLICY WITH TWO FAILURE MODESKAIO N; OSAKI S.1979; R.A.I.R.O., RECH. OPERAT.; FRA; DA. 1979; VOL. 13; NO 2; PP. 205-209; ABS. FRE; BIBL. 3 REF.Article

GENERAL TRIGGER-OFF REPLACEMENT PROCEDURES FOR TWO-UNIT SYSTEMSBERG M.1978; NAV. RES. LOGIST. QUART.; USA; DA. 1978; VOL. 25; NO 1; PP. 15-29; BIBL. 3 REF.Article

OPTIMAL REPLACEMENT POLICY FOR THE CASE WHERE THE DAMAGE PROCESS IS A ONE-SIDED LEVY PROCESSZUCKERMAN D.1978; STOCHAST. PROCESS. APPL.; NLD; DA. 1978; VOL. 7; NO 2; PP. 141-151; BIBL. 10 REF.Article

PURCHASE-REPLACEMENT RULES FOR DECAYING SERVICE FACILITIES.LOVE CE.1977; COMPUTERS OPER. RES.; G.B.; DA. 1977; VOL. 4; NO 2; PP. 111-118; BIBL. 9 REF.Article

VEHICLE REPLACEMENT: A CASE STUDY IN ADAPTING A STANDARD APPROACH FOR A LARGE ORGANISATION = REMPLACEMENT DE VEHICULES: UNE ETUDE DE CAS DANS L'ADAPTATION D'UNE APPROCHE STANDARD POUR UNE GRANDE ORGANISATIONRUSSELL JC.1982; J. OPER. RES. SOC.; ISSN 0160-5682; GBR; DA. 1982; VOL. 33; NO 10; PP. 899-911; BIBL. 3 REF.Article

  • Page / 31