Results 1 to 25 of 101

  • Page / 5
Export

Selection :

  • and

IMPROVEMENT OF TRANSIENT PERFORMANCE OF DWR SYNCHRONOUS GENERATORS BY COORDINATION OF REGULATOR PARAMETERSSARKAR BN; VERMA VK; MUKHOPADHYAY P et al.1981; ELECTR. POWER ENERGY SYST.; ISSN 0142-0615; GBR; DA. 1981; VOL. 3; NO 3; PP. 134-139; BIBL. 11 REF.Article

ETUDE DU COURT-CIRCUIT SYMETRIQUE BRUSQUE D'UN ALTERNATEUR A BASSE FREQUENCERAZEK AA; DE SIQUEIRA CAMPOS M; POLOUJADOFF M et al.1979; REV. GEN. ELECTR.; FRA; DA. 1979; VOL. 88; NO 6; PP. 457-462; ABS. ENG; BIBL. 5 REF.Article

APPLICACION DE UN CORTOCIRCUITO TRIFASICO A LA MAQUINA SINCRONICA. = APPLICATION D'UN COURT-CIRCUIT TRIPHASE A UNE MACHINE SYNCHRONEPEDRO LAZZARI A.1977; REV. ELECTROTEC.; ARGENT.; DA. 1977; VOL. 63; NO 3; PP. 93-104; BIBL. 7 REF.Article

ANALYSIS OF SYNCHRONOUS GENERATOR SEQUENTIAL SHORT CIRCUITS.SRIHARAN S; DE OLIVERIA SEM.1977; PROC. INST. ELECTR. ENGRS; G.B.; DA. 1977; VOL. 124; NO 6; PP. 549-553; BIBL. 6 REF.Article

SUDDEN 3-PHASE SHORT-CIRCUIT CHARACTERISTICS OF TURBINE GENERATORS FROM DESIGN DATA USING ELECTROMAGNETIC FIELD CALCULATIONSHANNALLA AY; MACDONALD DC.1980; IEE PROC., PART C; ISSN 0143-7046; GBR; DA. 1980; VOL. 127; NO 4; PP. 213-220; BIBL. 14 REF.Article

MODELAREA MATEMATICA A REGIMURILOR DE FUNCTIONARE LA SCURT-CIRCUIT TRIFAZAT BRUSC SI LA MERSUL IN ASINCRON A TURBOGENERATOARELOR DE MARE PUTERE, ASISTATA DE CALCULATORUL NUMERIC = LA MODELISATION DU REGIME DE COURT-CIRCUIT TRIPHASE BRUSQUE ET DU REGIME ASYNCHRONE D'UN GRAND TURBOGENERATEURDOGARU M; IORDACHE M; VOICU N et al.1980; ELECTROTEH. ELECTRON. AUTOMAT., ELECTROTEH.; ROM; DA. 1980; VOL. 28; NO 5; PP. 228-236; ABS. RUS/GER/ENG; BIBL. 12 REF.Article

EFFECT OF THREE-PHASE SYSTEM FAULTS AND FAULTY SYNCHRONISATION ON THE MECHANICAL STRESSING OF LARGE TURBINE-GENERATORS.HAMMONS TJ.1977; REV. GEN. ELECTR.; FR.; DA. 1977; VOL. 86; NO 7-8; PP. 558-580; ABS. FR.; BIBL. 14 REF.Article

TRANSIENT STABILITY OF PARELLEL AC-DC TRANSMISSION SYSTEMS.SAHU S; MOHANTY AK.1976; J. INSTIT. ENGRS (INDIA), ELECTR. ENGNG DIV.; INDIA; DA. 1976; VOL. 57; NO 3; PP. 153-158; BIBL. 3 REF.Article

UNE NOUVELLE SOLUTION POUR LES EQUATIONS DE DEFAUT TRIPHASE DES MACHINES SYNCHRONESLUPKIN VM.1981; ELEKTRICESTVO; ISSN 0013-5380; SUN; DA. 1981; NO 11; PP. 50-53; BIBL. 4 REF.Article

A STUDY OF THE EFFECT OF SOLID ROTOR ON THE TRANSIENT PERFORMANCE OF A DWR SYNCHRONOUS GENERATORBHAKTA P.1978; J. INSTIT. ENGRS (INDIA), ELECTR. ENGNG DIV.; IND; DA. 1978; VOL. 59; NO 3; PP. 142-149; BIBL. 22 REF.Article

EFFECT OF FIELD FAILURE OF A D.W.R. GENERATORSARKAR BN; VERMA VK; MUKHOPADHYAY P et al.1980; I.E.E. PROC., C; GBR; DA. 1980; VOL. 127; NO 2; PP. 82-89; BIBL. 11 REF.Article

FAST TURBINE VALVING AND INDEPENDENT POLE TRIPPING BREAKER APPLICATIONS FOR PLANT STABILITYBALU NJ.1980; IEEE TRANS. POWER APPAR. SYST.; ISSN 0018-9510; USA; DA. 1980; VOL. 99; NO 4; PP. 1330-1342; BIBL. DISSEM.Article

BERECHNUNG DES DREIPOLIGEN KURZSCHLUSSTROMES UNTER BERUECKSICHTIGUNG DES SAETTIGUNGS-VERHALTENS UND DER SPANNUNGSREGELUNG DER SYNCHRONGENERATOREN = CALCUL DES COURANTS DE COURT-CIRCUIT TRIPOLAIRES COMPTE TENU DE LA SATURATION ET DE LA REGULATION DE TENSION DES GENERATEURS SYNCHRONESSCHULZ W.1979; ELEKTRIE; DDR; DA. 1979; VOL. 33; NO 5; PP. 270-275; ABS. RUS/ENG; BIBL. 7 REF.Article

TURBOGENERATOR SHORT CIRCUITS WITH DELAYED CURRENT ZEROS.LIM LS; SMITH IR.1977; PROC. INSTIT. ELECTR. ENGRS; G.B.; DA. 1977; VOL. 124; NO 12; PP. 1163-1169; BIBL. 18 REF.Article

TRANSIENT TORQUE OF TURBINE-GENERATOR SYSTEM UNDER SEQUENTIAL THREE-PHASE FAULT CURRENT INTERRUPTION.FUJIWARA R; SUZUKI H; UEMURA K et al.1976; ELECTR. ENGNG JAP.; U.S.A.; DA. 1976; VOL. 96; NO 5; PP. 49-54; BIBL. 5 REF.Article

BREF APERCU DES PROBLEMES ET DEVELOPPEMENTS ACTUELS DANS LE DOMAINE DES PROTECTIONS.DIENNE G; BIRCH FH.1976; IN: CONF. INT. GRANDS RESEAUX ELECTR. HAUTE TENSION; PARIS; 1976; PARIS; CIGRE; DA. 1976; VOL. 34.09; PP. (16P.); BIBL. 9 REF.Conference Paper

HIGH-RESPONSE EXCITATION SYSTEMS ON TURBINE-GENERATORS: A STABILITY ASSESSMENTHURLEY JD; BALDWIN MS.1982; IEEE TRANS. POWER APPAR. SYST.; ISSN 0018-9510; USA; DA. 1982; VOL. 101; NO 11; PP. 4211-4222; BIBL. 11 REF.Article

ACCURATE MODELLING OF FREQUENCY-DEPENDENT TRANSMISSION LINES IN ELECTROMAGNETIC TRANSIENT SIMULATIONSMARTI JR.1982; IEEE TRANS. POWER APPAR. SYST.; ISSN 0018-9510; USA; DA. 1982; VOL. 101; NO 1; PP. 147-157; BIBL. 16 REF.Article

CLEARANCE OF SHORT-CIRCUITS WITH DELAYED CURRENT ZEROS IN THE ITAIPU 550 KV-SUBSTATIONKULICKE B; SCHRAMM HH.1980; IEEE TRANS. POWER APPAR. SYST.; ISSN 0018-9510; USA; DA. 1980; VOL. 99; NO 4; PP. 1406-1414; BIBL. 6 REF.Article

AN ULTRAFAST FAULT SENSOR FOR A FAULT CURRENT LIMITING DEVICELEE I; CARBERRY R; KNAUER W et al.1979; I.E.E.E. TRANS. POWER APPAR. SYST.; USA; DA. 1979; VOL. 98; NO 3; PP. 1069-1079; BIBL. 4 REF.Article

3-PHASE SUDDEN-SHORT-CIRCUIT ANALYSIS OF AN ASYNCHRONISED SYNCHRONOUS MACHINE.KAYNAK MO; CREIGHTON GK; SMITH IR et al.1975; PROC. INSTIT. ELECTR. ENGRS; G.B.; DA. 1975; VOL. 122; NO 9; PP. 917-918; BIBL. 4 REF.Article

Analyse des caractéristiques angulaires statiques d'un relais de puissance directionnelSHULYAK, V. G; GALKIN, A. I.Elektromehanika. 1983, Num 9, pp 86-91, issn 0136-3360Article

MOTOR CONTRIBUTION DURING THREE-PHASE SHORT CIRCUIT FAULTYU LY; MINCEFF I; HAMILTON DW et al.1982; IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS; ISSN 0093-9994; USA; DA. 1982; VOL. 18; NO 6; PP. 593-599; BIBL. 19 REF.Article

KRAFTWIRKUNGEN BEI LINEAREN INDUKTIONSMASCHINEN IN STOERUNGSFAELLEN = LES FORCES DANS LES MOTEURS ASYNCHRONES LINEAIRES EN REGIME PERTURBEODENDAHL A; SATTLER PK.1980; E.T.Z. ARCH.; DEU; DA. 1980; VOL. 2; NO 4; PP. 127-131; BIBL. 13 REF.Article

MECHANICAL STRESSING OF LARGE TURBINE-GENERATORS AT LP TURBINE BLADE ROOTS AND SHAFT COUPLINGS FOLLOWING CLEARANCE OF GRID SYSTEM FAULTS AND FAULTY SYNCHRONISATIONHAMMONS TJ.1978; REV. GEN. ELECTR.; FRA; DA. 1978; VOL. 87; NO 11; PP. 829-853; ABS. FRE; BIBL. 6 REF.Article

  • Page / 5