kw.\*:("TRACE PIPELINE")
Results 1 to 25 of 622
Selection :
BUCKEYE BUILDS 75-MILE LINE ALONG RESTRICTED RIGHT OF WAY. = "BUCKEYE" CONSTRUIT UN PIPELINE DE 75 MILLES LE LONG D'UNE PISTE DE LARGEUR REDUITE1975; PIPE LINE INDUSTRY; U.S.A.; DA. 1975; VOL. 42; NO 6; PP. 56-57Article
PIPELINE CORRIDOR SELECTION MODEL CONCEPT. = PRINCIPE D'UN MODELE DE CHOIX DE CORRIDOR DE PIPELINESTASTNY FJ.1975; PROC. AMER. SOC. CIV. ENGRS, TRANSPORT. ENGNG J.A.S.C.E.; U.S.A.; DA. 1975; VOL. 101; NO 2; PP. 337-344Article
PROJET D'UN PROFIL OPTIMAL DES CONDUITES SOUS-MARINESSHADRIN OB; SULEJMANOV IN.1975; TRANSP. KHRAN. NEFTI NEFTEPROD.; S.S.S.R.; DA. 1975; NO 2; PP. 20-22; BIBL. 1 REF.Article
JAPAN'S TRAFFIC JAMS MAY BE EASED BY NEW PIPELINE PROJECTS = LA CONGESTION DU TRAFIC AU JAPON PEUT ETRE SOULAGEE PAR LES NOUVEAUX PROJETS DE PIPELINEISHIGURO K.1975; OIL GAS J.; U.S.A.; DA. 1975; VOL. 73; NO 19; PP. 68-70Article
COMPUTATION OF NUMBER OF HELICOPTERS BELONGING TO THE PREVENTION EQUIPMENT OF INCIDENT BY FOLLOW PIPELINE TRACINGSTOLYAROV RN.1975; TRANSP. KHRAN. NEFTI NEFTEPROD.; S.S.S.R.; DA. 1975; NO 12; PP. 12-15; BIBL. 5 REF.Article
DE LA PRECISION DANS LA DETERMINATION DE LA SITUATION DANS L'ESPACE DES CONDUITES PETROLIERES SOUS-MARINES D'UNE GRANDE LONGUEUREREMIN NF; ZABELA KA.1975; TRANSP. KHRAN. NEFTI NEFTEPROD.; S.S.S.R.; DA. 1975; NO 2; PP. 22-24; BIBL. 1 REF.Article
RECHERCHE DU MEILLEUR TRACE D'UN PIPE-LINE A DIAMETRE CONSTANT ENTRE CERTAINS POINTS DE DEPART ET D'ARRIVEEBESKHIZHKO VV; BORODAVKIN PP.1974; TRANSP. KHRAN. NEFTI NEFTEPROD.; S.S.S.R.; DA. 1974; NO 10; PP. 18-20; BIBL. 4 REF.Article
RECHERCHE DU MEILLEUR TRACE D'UN PIPELINE A DERIVATIONSBORODAVKIN PP; BEREZIN VL; LYSYJ OV et al.1973; TRANSP. KHRAN. NEFTI NEFTEPROD.; S.S.S.R.; DA. 1973; NO 3; PP. 21-23; BIBL. 4 REF.Serial Issue
NORTH SEA OIL AND GAS. = PETROLE ET GAZ DE MER DU NORD1975; PIPELINE GAS J.; U.S.A.; DA. 1975; VOL. 202; NO 12; PP. 48-52Article
METHODE HIERARCHIQUE DE RECHERCHE DES TRACES OPTIMA DES PIPE-LINES TRES ALLONGESBORODAVKIN PP; KIM BI; BRAGILEVSKIJ OV et al.1975; TRANSP. KHRAN. NEFTI NEFTEPROD.; S.S.S.R.; DA. 1975; NO 5; PP. 39-41; BIBL. 6 REF.Article
PERUVIAN LINE TAMES DIFFICULT ROUTE. = UN PIPELINE PERUVIEN EMPRUNTE UN TRACE DIFFICILEFRANCO A.1976; OIL GAS J.; U.S.A.; DA. 1976; VOL. 74; NO 20; PP. 147-150Article
SURETE DE LA PARTIE LINEAIRE DU SYSTEME DE PIPE-LINE DE GAZFAVORITOV YU A.1974; IZVEST. VYSSH. UCHEBN. ZAVED., NEFT GAZ; S.S.S.R.; DA. 1974; VOL. 17; NO 10; PP. 79-84; BIBL. 4 REF.Article
CHINA'S PRODUCTION MAY JUMP SIX-FOLD BY 1985. = LA PRODUCTION DE LA CHINE POURRAIT ETRE MULTIPLIEE PAR SIX D'ICI 19851975; WORLD OIL; U.S.A.; DA. 1975; VOL. 181; NO 5; PP. 145-154 (6P.)Article
EKOFISK-TEESSIDE LINE TO OPERATE CONTINUOUSLY = LE PIPELINE EKOFISK-TEESIDE FONCTIONNERA EN CONTINUMASSEY PS.1975; OIL GAS J.; U.S.A.; DA. 1975; VOL. 73; NO NO 8; PP. 85-89Article
FOLD-OUT MAP. = CARTE DEPLIANTE1975; PIPE LINE INDUSTRY; U.S.A.; DA. 1975; VOL. 43; NO 2; PP. 37Article
TRANS CANADA LOOPING REQUIRES 7 MILLION FEET OF BLAST HOLES. HARD ROCK ROW THROUGH ONTARIO REQUIRED 44 ROCK DRILLS FOR TRANS CANADA'S 1972 LOOP CONSTRUCTION = LA REALISATION DU TRANSCANADA NECESSITERA 7 MILLIONS DE PIEDS DE TROUS DE MINES. LES ROCHES DURES EN ONTARIO ONT DU ETRE FOREES EN 44 ENDROITS POUR LA CONSTRUCTION DU TRANSCANADA EN 19721973; PIPE LINE INDUSTRY; U.S.A.; DA. 1973; VOL. 38; NO 1; PP. 33-34Serial Issue
NORTH SEA: A MAJOR CHALLENGE FOR PIPE LINE CONSTRUCTION = MER DU NORD: UN IMPORTANT DEFI POUR LA CONSTRUCTION DES PIPELINESDEASON D.1972; PIPE LINE INDUSTRY; U.S.A.; DA. 1972; VOL. 36; NO 6; PP. 57-59Serial Issue
ARCTIC GAS LINE STUDY GROUP EVALUATES ROUTES FOR PROJECT = LE GROUPE D'ETUDES DU GAZODUC ARCTIQUE ANALYSE DIFFERENTS TRACES POUR LE PROJETQUARLES B.1972; PIPE LINE NEWS; U.S.A.; DA. 1972; VOL. 44; NO 11; PP. 18-21Serial Issue
PIPELINE IN THE PINES = UN PIPELINE DANS LES PINS1975; PIPELINE GAS J.; U.S.A.; DA. 1975; VOL. 202; NO 1; PP. 58-60 (2 P.)Article
NATURAL GAS PIPE LINES. COMPANIES A PERSONNEL A FACILITIES = PIPELINES DE GAZ NATUREL. COMPAGNIES PERSONNEL. INSTALLATIONS1974; PIPE LINE NEWS; U.S.A.; DA. 1974; VOL. 46; NO 9 SUPPL; PP. 119-170 (44 P.)Article
POLAR GAS RESEARCHES DESIGN AND CONSTRUCTION OF HUGE ARCTIC ISLAND PIPELINE NETWORKS = RECHERCHES, CONCEPTION ET CONSTRUCTION PAR "POLAR GAS" DES RESEAUX DE PIPELINES SUR LES ILES ARCTIQUES1974; PIPE LINE NEWS; U.S.A.; DA. 1974; VOL. 46; NO 6; PP. 8-12 (3 P.)Article
TEXOMA TRUNKLINE WILL SUPPLY REFINERIES IN SEVEN STATES = LE PIPELINE TEXOMA APPROVISIONNERA LES RAFFINERIES DE SEPT ETATSDEASON D.1974; PIPE LINE INDUSTRY; U.S.A.; DA. 1974; VOL. 41; NO 4; PP. 27-29Article
TRACKING STEEL PIPELINES USING MAGNETIC GRADEOMETERSHILL J.1981; INTERPIPE '81. INTERNATIONAL PIPELINE TECHNOLOGY EXHIBITION AND CONFERENCE. 9/1981/HOUSTON TX; USA; HOUSTON: INTERPIPE '81 CONFERENCE; DA. 1981; PP. 299-305Conference Paper
PROGRAMMABLE CALCULATOR AIDS PIPELINE SURVEYING.LANDERS CR.1978; OIL GAS J.; U.S.A.; DA. 1978; VOL. 76; NO 11; PP. 70-72Article
DIX ANS POUR SE METTRE D'ACCORD SUR LE TRACE ALCAN. = TEN YEARS TO BE IN AGREEMENT ON ALCAN WAY1977; PETROLE INFORM., REV. PETROL.; FR.; DA. 1977; NO 1448; PP. 21-22Article