kw.\*:("TURBOGENERATOR SET")
Results 1 to 25 of 570
Selection :
CHANGES IN THE INVESTIGATION AND SELECTION OF SITES FOR NUCLEAR POWER STATIONSGAMMON KM; PEDGRIFF GF.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 1; PP. 41-45; BIBL. 5 REF.Article
TWENTY YEARS LATER: A SECOND NUCLEAR ERAWEINBERG AM.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 1; PP. 18-20Article
FORTSCHRITTE DER INGENIEURVERMESSUNG BEI KRAFTWERKEN = PROGRESS IN POWER PLANT ENGINEERING MEASUREMENTS = PROGRES REALISES DANS LES METHODES DE MESURES DANS LES CENTRALESZAK M.1981; VGB KRAFTWERKSTECH.; ISSN 0372-5715; DEU; DA. 1981; VOL. 61; NO 5; PP. 408-412; ABS. DAN/FIN/FRE/DUT/ITA/SWE; BIBL. 2 REF.Article
CIVIL ENGINEERING AND NUCLEAR ENERGYHANNAH IW.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 1; PP. 37-40; BIBL. 1 REF.Article
RESEARCH IN NUCLEAR ENERGYCURRAN S.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 1; PP. 24-27; BIBL. 1 REF.Article
NUCLEAR ENERGY: 20 YEARS ONSHERFIELD.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 1; PP. 15-17; BIBL. 1 REF.Article
COMPONENT CLASSIFICATION IN TURBINE-GENERATOR MANUFACTUREBUTZBACH D.1983; NUCLEAR ENGINEERING INTERNATIONAL; ISSN 0029-5507; GBR; DA. 1983; VOL. 28; NO 337; PP. 42-45Article
LARGE SCALE TEST FACILITIES TO ASSURE FUTURE TURBINE-GENERATOR RELIABILITY.QUICK SL.1976; NUCL. ENGNG INTERNATION.; G.B.; DA. 1976; VOL. 21; NO 249; PP. 59-60Article
FORT ST VRAIN EXPERIENCEBREY HL; OLSON HG.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 2; PP. 117-121; BIBL. 7 REF.Article
LIGHT WATER REACTOR ACCIDENTS: IS THERE REALLY A MAJOR PUBLIC RISK.LEVENSON M.1983; NUCLEAR ENERGY (1978); ISSN 0140-4067; GBR; DA. 1983; VOL. 22; NO 2; PP. 75-82; BIBL. 1 REF.Article
GROUPES ELECTROGENES A TURBINE A GAZ1979; MAINTENANCE; FRA; DA. 1979; NO 97; PP. 36Article
NEW LIFE AVAILABLE FOR OLD T/GS AND BOILERSFRIEDLANDER GD.1983; ELECTRICAL WORLD; ISSN 0013-4457; USA; DA. 1983; VOL. 197; NO 5; PP. 87-96Article
ERFAHRUNGEN MIT KONVENTIONELLEN 1300-MW-DAMPFTURBOGRUPPEN = EXPERIENCE GAINED WITH CONVENTIONAL 1300 MW STEAM TURBINE SETS = EXPERIENCE ACQUISE AVEC DES GROUPES CONVENTIONNELS DE TURBOGENERATEURS DE 1300 MWREINHARD K.sdKRAFT-WERKE 1977. KONFERENZ/1977/COPENHAGUE; DEU; ESSEN: VGB-KRAFTWERKSTECHNIK; DA. S.D.; 527-550; BIBL. 3 REF.Conference Paper
MECHANICAL CASING REPAIRS EXTEND LIFE OF OLD T-6SPAPAMARCOS J.1983; POWER ENGINEERING (BARRINGTON, ILL.); ISSN 0032-5961; USA; DA. 1983; VOL. 87; NO 3; PP. 55-57Article
TUNING OF STABILIZERS IN MULTIMACHINE POWER SYSTEMSLEFEBVRE S.1983; IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS; ISSN 0018-9510; USA; DA. 1983; VOL. 102; NO 2; PP. 290-299; BIBL. 8 REF.Article
MAINTENANCE SCHEDULING: DESCRIPTION, LITERATURE SURVEY, AND INTERFACE WITH OVERALL OPERATIONS SCHEDULINGYAMAYEE ZA.1982; IEEE TRANS. POWER APPAR. SYST.; ISSN 0018-9510; USA; DA. 1982; VOL. 101; NO 8; PP. 2770-2779; BIBL. 78 REF.Article
NUEVA TURBINA PARA APROVECHAR LA ENERGIA EOLICA = UNE NOUVELLE TURBINE POUR L'EXPLOITATION DE L'ENERGIE EOLIENNEWATSON G.1979; REV. ELECTROTEC.; ARG; DA. 1979; VOL. 65; NO 5; PP. 210-211Article
INDONESIA USES U.S. TECHNOLOGY TO OBTAIN ELECTRICITY FROM THE EARTH1978; GEOTHERM. ENERGY; USA; DA. 1978; VOL. 6; NO 11; PP. 20-21Article
SYNCHRONIZING GIANT GENERATORS BY HAND CAN CREATE EXPENSIVE FIREWORKS. BUT A MINI CLOSES THE LARGE CIRCUIT BREAKERS WITH PRECISION.BERGER WR.1978; ELECTRON. DESIGN; U.S.A.; DA. 1978; VOL. 26; NO 2; PP. 94-97; BIBL. 2 REF.Article
CONTRIBUTION TO THE RELIABILITY INDICATOR ESTIMATION OF POWER UNITS ON THE BASIS OF OPERATION STATISTIC DATA. = CONTRIBUTION A L'ESTIMATION DE L'INDICATEUR DE SECURITE A BASE DES DONNEES D'EXPLOITATIONNITU VI; IONESCU C.1977; REV. ROUMAINE. SCI. TECH., ELECTROTECH. ENERGET.; ROUMAN.; DA. 1977; VOL. 22; NO 1; PP. 21-32; ABS. ALLEM. ANGL.; BIBL. 3 REF.Article
RELATION POUR DETERMINER LA LARGEUR DES GROUPES DES CENTRALES HYDRAULIQUESOBUKHOV EV.1982; IZV. VYSS. UCEBN. ZAVED., ENERG.; ISSN 0579-2983; BYS; DA. 1982; NO 8; PP. 75-78; BIBL. 5 REF.Article
EXPERIENCE DE L'EXPLOITATION DANS LES CENTRALES HYDRAULIQUES A CHUTE DES GROUPES HYDRAULIQUES A BOULONS LIBRES DANS LES ACCOUPLEMENTS D'ARBRES A BRIDEBUGOV AU; PETROCHENKO VS; RIZHAMADZE GA et al.1981; ENERGO-MASHINOSTR.; SUN; DA. 1981; NO 4; PP. 27-28; BIBL. 2 REF.Article
TANDEM-COMPOUND 1800-R/MIN TURBINE-GENERATORS TO MATCH VERY LARGE SUPERHEATED STEAM SUPPLY SYSTEMSJOYCE JS; HAAS H; HEINRICHS F et al.1980; PROC. AM. POWER CONF.; ISSN 0097-2126; USA; DA. 1980; VOL. 42; PP. 233-242; BIBL. 7 REF.Conference Paper
LE CHOIX DES GROUPES COHERENTS ET DES GENERATEURS EQUIVALENTS DANS LES RESEAUX D'ENERGIE COMPLEXESILIEV S.1977; Z. ELEKTR. INFORM.- U. ENERGIETECH.; DTSCH.; DA. 1977; VOL. 7; NO 4; PP. 337-343; BIBL. 11 REF.Article
OPERATING AT OFF-NORMAL CONDITIONS.BAILY FG; BARDWICK HA; FENTON RE et al.1976; POWER; U.S.A.; DA. 1976; VOL. 120; NO 8; PP. 61-65Article