Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("UNDERWATER TUNNEL")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 312

  • Page / 13
Export

Selection :

  • and

PROBLEMY GEODEZYJNE PODCZAS BUDOWY TUNELI PODWODNYCH Z ELEMENTOW PREFABRYKOWANYCH = PROBLEMES GEODESIQUES LORS DE LA CONSTRUCTION DES TUNNELS SOUS-MARINS A ELEMENTS PREFABRIQUESZUROWSKI A.1982; PRZ. GEOD.; ISSN 0033-2127; POL; DA. 1982; VOL. 54; NO 9; PP. 143-145; ABS. RUS/ENG/GER/FRE; BIBL. 5 REF.Article

TRAVAUX GEODESIQUE LORS DE LA CONSTRUCTION DE TUNNELS SOUS L'EAUKOUGIYA VA; PETROV VD; SERGEEV OP et al.1982; GEOD. KARTOGR.; ISSN 0016-7126; SUN; DA. 1982; NO 8; PP. 16-20; BIBL. 6 REF.Article

CONSTRUCTING IMMERSED TUNNELSVOS ICJ.1979; TUNNELS AND TUNNELLG; GBR; DA. 1979; VOL. 11; NO 3; PP. 42-44Article

ECONOMIC POTENTIAL AND THE CHANNEL TUNNEL = POTENTIEL ECONOMIQUE ET LE TUNNEL SOUS LA MANCHEKEEBLE D; OWENS PL; THOMPSON C et al.1982; AREA (LAND. 1969); ISSN 510254; GBR; DA. 1982; VOL. 14; NO 2; PP. 97-103; BIBL. 19 REF.Article

SEIKRAN UNDERSEA TUNNEL = TUNNEL SOUS-MARIN DE SEIKANNISUGI I.1982; WEAK ROCK-SOFT, FRACTURED AND WEATHERED ROCK. INTERNATIONAL SYMPOSIUM ON WEAK ROCK/1981-09-21/TOKYO; NLD; ROTTERDAM: A.A. BALKEMA; DA. 1982; PP. 1345-1353Conference Paper

OFFSHORE OIL TUNNELS. I: TUNNELLING FOR OIL BENEATH THE SEA. A NEW SOLUTION. = TUNNEL DE PETROLE OFFSHORE. I. PERCEMENT DE TUNNEL POUR LE PETROLE EN MER. UNE NOUVELLE SOLUTIONWALTON B.1980; TUNNELS AND TUNNELLG; GBR; DA. 1980; VOL. 12; NO 6; PP. 26-30; BIBL. 1 REF.Article

Eurotunnel = The Channel TunnelTHIEVENT, G; BABINET, L.L' Ingénieur constructeur ETP. 1989, Num 368, pp 22-27, issn 0046-9513, 6 p.Article

Le tunnel sous la Manche. La meilleure façon d'y aller = The Channel'tunnel. The best way of going thereNADAL, P.Chantiers de France (Paris). 1987, Num 200, pp 1-14, issn 0397-4650Article

Un peu d'histoire.. = History..NAESSANY, S.P.C.M. Ponts et chaussées et mines. 1986, Vol 83, Num 10, pp 30-32, issn 0397-4634Article

CONSTRUCTING THE UNDERSEA SECTION OF THE SEIKAN TUNNEL = CONSTRUCTION DE LA SECTION SOUS MARINE DU TUNNEL DE SEIKANFUJITA M; NISHIMURA T; KITAMURA A et al.1982; TUNN. TUNNELL.; ISSN 0041-414X; GBR; DA. 1982; VOL. 14; NO 8; PP. 31-33Article

SEIKAN UNDERSEA TUNNEL = LE TUNNEL SOUS-MARIN SEIKANPAULSON BC JR.1981; PROC. AM. SOC. CIV. ENG., J. CONSTR. DIV.; ISSN 0569-7948; USA; DA. 1981; VOL. 107; NO C03; PP. 509-525; BIBL. 5 REF.Article

IMMERSED TUNNELS SOLVE DELTA CROSSING PROBLEMSMARTIN D.1979; TUNNELS AND TUNNELLG; GBR; DA. 1979; VOL. 11; NO 1; PP. 17-22; (5 P.)Article

A NEW METHOD FOR INSTALLING A LARGE-DIAMETER, CONTINUOUSLY WELDED STEEL SUBMARINE PIPELINE = NOUVELLE METHODE D'INSTALLATION D'UN PIPELINE SOUS MARIN EN ACIER DE GRAND DIAMETRE SOUDE D'UNE FACON CONTINUEGILLIS DA.1979; J. AMER. WAT. WORKS ASS.; USA; DA. 1979; VOL. 71; NO 6; PP. 295-300; BIBL. 1 REF.Article

SETTLEMENTS OF IMMERSED TUNNELSSCHMIDT B; GRANTZ W.sdAMERICAN SOCIETY OF CIVIL ENGINEERS. CONVENTION AND EXPOSITION/1978/CHICAGO IL; USA; S.L.: ASCE; DA. S.D.; VOL. 3357; PP. 1-28; BIBL. 9 REF.Conference Paper

LA CONSTRUCTION DES TUNNELS AU JAPONYOKATA T.1982; EXCAVATOR; BEL; DA. 1982; NO 462; PP. 12-23; (6 P.); IDEM FLEArticle

TUNNEL SOUS LE VIEUX PORT A BASTIAARLET A; BOUTAUD P; BIDAULT R et al.1982; TRAVAUX; ISSN 0041-1906; FRA; DA. 1982; NO 572; PP. 67-73; ABS. ENG/GER/SPA/PORArticle

WORLD LIST OF IMMERSED TUBESCULVERWELL DR.1981; TUNN. TUNNELL.; ISSN 0041-414X; GBR; DA. 1981; VOL. 13; NO 8; PP. 17-23; BIBL. 3 REF.Article

TUNNELS AND EXCAVATIONSOUD HJC.1979; GEOL. EN MIJNBOUW; NLD; DA. 1979; VOL. 58; NO 4; PP. 417-432; BIBL. 18 REF.Article

SEIKAN PILOT TUNNEL OPENS THE WAY FOR JAPAN'S 23 KM UNDERSEA RAIL LINK = LE TUNNEL PILOTE DE SEIKAN, JAPON, OUVRE LA VOIE A UN RESEAU FERROVIAIRE SOUS-MARIN DE 23 KM1983; TUNNELS AND TUNNELLING; ISSN 0041-414X; GBR; DA. 1983; VOL. 15; NO 7; PP. 24-25Article

FIRST SUSPENDED IMMERSED TUBE TUNNEL MAY BE BUILT IN NORWAY = LE PREMIER TUNNEL PAR TUBE IMMERGE SUSPENDU POURRA ETRE CONSTRUIT EN NORVEGEMARTIN D.1981; TUNN. TUNNELL.; ISSN 0041-414X; GBR; DA. 1981; VOL. 13; NO 8; PP. 38Article

UNDERSEA TUNNELS CARRY NORWEGIAN "PLUTO" ASHORE = TUNNELS SOUS MARIN POUR TRANSPORTER A LA COTE LE "PLUTO" NORVEGIENMARTIN D.1982; TUNNELS AND TUNNELLING; ISSN 0041-414X; GBR; DA. 1982; VOL. 14; NO 11; PP. 24-26Article

DESIGNING IMMERSED TUNNELSGLERUM A.1979; TUNNELS AND TUNNELLG; GBR; DA. 1979; VOL. 11; NO 2; PP. 29-32; BIBL. 5 REF.Article

Transmanche express = Transenglish Channel expressL' Ingénieur constructeur ETP. 1986, Num 322, issn 0046-9513, 23Article

Present situation of the Seikan undersea tunnel construction workSATO, H.Japanese railway engineering. 1986, Vol 25, Num 97, pp 2-6, issn 0448-8938Article

Construction works of the Seikan undersea tunnel = Travaux du tunnel sous-marin de SeikanMOCHIDA, Y.Japanese railway engineering. 1983, Vol 22, Num 4, pp 4-19, issn 0448-8938Article

  • Page / 13