au.\*:("VAN WASSENHOVE LN")
Results 1 to 8 of 8
Selection :
A BICRITERION APPROACH TO TIME/COST TRADE-OFFS IN SEQUENCING = UNE APPROCHE A DEUX CRITERES DES COMPROMIS ENTRE LE TEMPS ET LE COUT DANS L'ORDONNANCEMENTVAN WASSENHOVE LN; BAKER KR.1982; EUR. J. OPER. RES.; ISSN 0377-2217; NLD; DA. 1982; VOL. 11; NO 1; PP. 48-54; BIBL. 6 REF.Article
SOLVING A BICRITERION SCHEDULING PROBLEMVAN WASSENHOVE LN; GELDERS LF.1980; EUROP. J. OPERAT. RES.; NLD; DA. 1980; VOL. 4; NO 1; PP. 42-48; BIBL. 9 REF.Article
PLANNING PRODUCTION IN A BOTTLENECK DEPARTMENTVAN WASSENHOVE LN; VANDERHENST P.1983; EUROPEAN JOURNAL OF OPERATIONAL RESEARCH; ISSN 0377-2217; NLD; DA. 1983; VOL. 12; NO 2; PP. 127-137; BIBL. 9 REF.Article
A DECOMPOSITION ALGORITHM FOR THE SINGLE MACHINE TOTAL TARDINESS PROBLEMPOTTS CN; VAN WASSENHOVE LN.1982; OPERATIONS RESEARCH LETTERS; ISSN 507679; NLD; DA. 1982; VOL. 1; NO 5; PP. 177-181; BIBL. 9 REF.Article
PRODUCTION PLANNING: A REVIEWGELDERS LF; VAN WASSENHOVE LN.1981; EUROP. J. OPER. RES.; ISSN 0377-2217; NLD; DA. 1981; VOL. 7; NO 2; PP. 101-110; BIBL. 41 REF.Article
CAPACITATED LOT SIZING FOR INJECTION MOULDING: A CASE STUDYVAN WASSENHOVE LN; DE BODT MA.1983; JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY; ISSN 0160-5682; GBR; DA. 1983; VOL. 34; NO 6; PP. 489-501; BIBL. 13 REF.Article
A LARGE SCALE LOCATION-ALLOCATION PROBLEM IN THE NATURAL RUBBER INDUSTRYNAMBIAR JM; GELDERS LF; VAN WASSENHOVE LN et al.1981; EUROP. J. OPER. RES.; ISSN 0377-2217; NLD; DA. 1981; VOL. 6; NO 2; PP. 183-189; BIBL. 8 REF.Article
LOT SIZING AND SAFETY STOCK DECISIONS IN AN MRP SYSTEM WITH DEMAND UNCERTAINTYDE BODT MA; VAN WASSENHOVE LN; GELDERS LF et al.1982; ENG. COSTS PROD. ECON.; ISSN 0167-188X; NLD; DA. 1982-04; VOL. 6; PP. 67-75; BIBL. 18 REF.Article