Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("disassembly systems")

Results 1 to 3 of 3

  • Page / 1
Export

Selection :

  • and

A two-stage heuristic for disassembly scheduling with assembly product structureLEE, D-H; XIROUCHAKIS, P.The Journal of the Operational Research Society. 2004, Vol 55, Num 3, pp 287-297, issn 0160-5682, 11 p.Article

Disassembly scheduling: integer programming modelsLEE, D-H; KIM, H-J; CHOI, G et al.Proceedings of the Institution of Mechanical Engineers. Part B. Journal of engineering manufacture. 2004, Vol 218, Num 10, pp 1357-1372, issn 0954-4054, 16 p.Article

Disassembly scheduling with capacity constraints : minimizing the number of products disassembledKIM, Jun-Gyu; JEON, Hyong-Bae; KIM, Hwa-Joong et al.Proceedings of the Institution of Mechanical Engineers. Part B. Journal of engineering manufacture. 2006, Vol 220, Num 9, pp 1473-1481, issn 0954-4054, 9 p.Article

  • Page / 1