Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:(%22Analytic hierarchy process%22)

Filter

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 495225

  • Page / 19809
Export

Selection :

  • and

Note on consistency ratio: A replyAPOSTOLOU, B; HASSELL, J. M.Mathematical and computer modelling. 2002, Vol 35, Num 9-10, pp 1081-1083, issn 0895-7177Article

Cost-benefit analysis of different hydrogen production technologies using AHP and Fuzzy AHPTHENGANE, Sonal K; HOADLEY, Andrew; BHATTACHARYA, Sankar et al.International journal of hydrogen energy. 2014, Vol 39, Num 28, pp 15293-15306, issn 0360-3199, 14 p.Article

Integrating multicriteria evaluation and stakeholders analysis for assessing hydropower projectsROSSO, M; BOTTERO, M; POMARICO, S et al.Energy policy. 2014, Vol 67, pp 870-881, issn 0301-4215, 12 p.Article

Sustainability of hydrogen supply chain. Part II: Prioritizing and classifying the sustainability of hydrogen supply chains based on the combination of extension theory and AHPJINGZHENG REN; MANZARDO, Alessandro; TONIOLO, Sara et al.International journal of hydrogen energy. 2013, Vol 38, Num 32, pp 13845-13855, issn 0360-3199, 11 p.Article

A structured approach to measuring functional dependency and sequencing of coupled tasks in engineering designCHUNG-YU SU, Joseph; CHEN, Shi-Jie; LI LIN et al.Computers & industrial engineering. 2003, Vol 45, Num 1, pp 195-214, issn 0360-8352, 20 p.Article

Scale transitivity in the AHPJI, P; JIANG, R.The Journal of the Operational Research Society. 2003, Vol 54, Num 8, pp 896-905, issn 0160-5682, 10 p.Article

Information accessibility and cryptic processesMAHONEY, John R; ELLISON, Christopher J; CRUTCHFIELD, James P et al.Journal of physics. A, Mathematical and theoretical (Print). 2009, Vol 42, Num 36, issn 1751-8113, 362002.1-362002.17Article

Supply chain risk modeling by AHP and Fuzzy AHP methodsRADIVOJEVIC, Gordana; GAJOVIC, Vladimir.Journal of risk research (Print). 2014, Vol 17, Num 3-4, pp 337-352, issn 1366-9877, 16 p.Article

Spatially explicit assessment of local biomass availability for distributed biogas production via anaerobic co—digestion — Mediterranean case studyZUBARYEVA, Alyona; ZACCARELLI, Nicola; GIUDICE, Cecilia Del et al.Renewable energy. 2012, Vol 39, Num 1, pp 261-270, issn 0960-1481, 10 p.Article

On the total productivity management of a maintenance float system through AHP applicationsMADU, C. N.International journal of production economics. 1994, Vol 34, Num 2, pp 201-207, issn 0925-5273Article

A note on Saaty's random indexesDONEGAN, H. A; DODD, F. J.Mathematical and computer modelling. 1991, Vol 15, Num 10, pp 135-137, issn 0895-7177Article

Approximate articulation of preference and priority derivation―a commentKRESS, M.European journal of operational research. 1991, Vol 52, Num 3, pp 382-383, issn 0377-2217Article

On lexicographic goal programming method for generating weights from inconsistent interval comparison matricesWANG, Ying-Ming.Applied mathematics and computation. 2006, Vol 173, Num 2, pp 985-991, issn 0096-3003, 7 p.Article

Examining alternatives in the interval analytic hierarchy process using complete enumerationCOX, M. A. A.European journal of operational research. 2007, Vol 180, Num 2, pp 957-962, issn 0377-2217, 6 p.Article

An assessment of exploiting renewable energy sources with concerns of policy and technologySHEN, Yung-Chi; LIN, Grace T. R; LI, Kuang-Pin et al.Energy policy. 2010, Vol 38, Num 8, pp 4604-4616, issn 0301-4215, 13 p.Article

Integrating the fuzzy analytic hierarchy process with dynamic programming approach for determining the optimal forest management decisionsZADNIK STIRN, Lidija.Ecological modelling. 2006, Vol 194, Num 1-3, pp 296-305, issn 0304-3800, 10 p.Conference Paper

Determination of optimal paths to task goals using expert system based on GOMS modelOYEWOLE, Samuel A; HAIGHT, Joel M.Computers in human behavior. 2011, Vol 27, Num 2, pp 823-833, issn 0747-5632, 11 p.Article

An attempt at decision making in tissue engineering: reactor evaluation using the analytic hierarchy process (AHP)OMASA, Takeshi; KISHIMOTO, Michimasa; KAWASE, Masaya et al.Biochemical engineering journal. 2004, Vol 20, Num 2-3, pp 173-179, issn 1369-703X, 7 p.Article

An Analytic Hierarchy Process to evaluate PEM fuel cell engine performanceYONGPING HOU; BOWEN WANG; GUANGBIN OUYANG et al.International journal of hydrogen energy. 2011, Vol 36, Num 11, pp 6780-6787, issn 0360-3199, 8 p.Article

Batch object modeling and languageBRISTOL, E. H.ISA transactions. 1997, Vol 36, Num 3, pp 197-207, issn 0019-0578Article

Selection of Internet advertising networks using an analytic Hierarchy process and grey Relational AnalysisLIN, Chin-Tasi; HSU, Pi-Fang.International journal of information and management sciences. 2003, Vol 14, Num 2, pp 1-16, issn 1017-1819, 16 p.Article

Base reference analytical hierarchy process for engineering process selectionHOTMAN, Elina.Lecture notes in computer science. 2005, issn 0302-9743, isbn 3-540-28894-5, vol1, 184-190Conference Paper

Prioritizing software development productivity factors using the analytic hierarchy processFINNIE, G. R; WITTIG, G. E; PETKOV, D. I et al.The Journal of systems and software. 1993, Vol 22, Num 2, pp 129-139, issn 0164-1212Article

Modeling technology adoption in the hardwood sawmillBOWEL, Scott A; SMITHY, Robert L.Wood and fiber science. 2006, Vol 38, Num 3, pp 484-496, issn 0735-6161, 13 p.Article

Inverse inconsistency in analytic hierarchiesDODD, F. J; DONEGAN, H. A; MCMASTER, T. B. M et al.European journal of operational research. 1995, Vol 80, Num 1, pp 86-93, issn 0377-2217Article

  • Page / 19809