Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:(%22Percement tunnel%22)

Filter

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Origin

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 68135

  • Page / 2726
Export

Selection :

  • and

Halland's Wijker tunnel; a subsea solution to traffic = Le tunnel hollandais de Wijker: une solution sous-marine à la conception du traficTAN, L.Tunnelling and underground space technology. 1994, Vol 9, Num 1, pp 47-51, issn 0886-7798Article

Financing of the Liefkenshoektunnel in Antwerp (Belgium)DE GROOF, J.Developments in geotechnical engineering. 1993, Vol 74, pp 887-894, issn 0165-1250Article

The method of non-settling shield driving of tunnelsROSENVASSER, G. R; SHAMRIN, Y. Y.Developments in geotechnical engineering. 1993, Vol 74, pp 463-472, issn 0165-1250Article

Large cross section tunnel excavation by chemical foam injection EPB shieldMIZUNO, K.Developments in geotechnical engineering. 1993, Vol 74, pp 401-410, issn 0165-1250Article

The design of the Piet Heintunnel, AmsterdamDE RONDE, S. F; DE KOO, G. J; SYTSEMA, D et al.Developments in geotechnical engineering. 1993, Vol 74, pp 267-280, issn 0165-1250Article

Mechanized construction method for long mountain tunnelKOMORI, H; TOMODA, T.Developments in geotechnical engineering. 1993, Vol 74, pp 605-614, issn 0165-1250Article

Cost optimisation of transportation tunnel projects on the basis of structural health monitoringSANDAGER JENSEN, J; ROSTAM, S; ECOB, C et al.Developments in geotechnical engineering. 1993, Vol 74, pp 805-816, issn 0165-1250Article

Horizontal jet grouting at a tunnel portal excavated in poor groundTAMAI, A; SAKURAI, S.Developments in geotechnical engineering. 1993, Vol 74, pp 749-758, issn 0165-1250Article

Execution of 27% downward gradient by slurry shield construction methodKATANO, S; OKADA, H.Developments in geotechnical engineering. 1993, Vol 74, pp 473-482, issn 0165-1250Article

Study on the self-supported segment assembly robot for the shield machine of tunnelUYEDA, H; HIGASHIDE, A; KUMAO, Y et al.Developments in geotechnical engineering. 1993, Vol 74, pp 771-780, issn 0165-1250Article

Long distance pipe jacking through hard sticky clay and extremly soft ground Sayreville, New JerseyBRAACH, O.Developments in geotechnical engineering. 1993, Vol 74, pp 391-399, issn 0165-1250Article

The tunnelling experience of Taiwan South Link Railway projectFU, R; KUNG, A.Developments in geotechnical engineering. 1993, Vol 74, pp 529-538, issn 0165-1250Article

Technical feasibility, costs and planning of drilled tunnels in Western HollandJONKER, J. H; TOPPER, A. M.Developments in geotechnical engineering. 1993, Vol 74, pp 153-163, issn 0165-1250Article

IL-22 : A critical mediator in mucosal host defenseAUJLA, S. J; KOLLS, J. K.Journal of molecular medicine (Berlin. Print). 2009, Vol 87, Num 5, pp 451-454, issn 0946-2716, 4 p.Article

Temporal associations between interleukin 22 and the extracellular domains of IL-22R and Il-10R2JING LI; TOMKINSON, Kathy N; DE ZUTTER, Gerard et al.International immunopharmacology. 2004, Vol 4, Num 5, pp 693-708, issn 1567-5769, 16 p.Article

Development of three centered slurry type shield method at station by effectively using the running shield for double-track subwayINOSE, J; SUKEGAWA, T; IMAI, K et al.Developments in geotechnical engineering. 1993, Vol 74, pp 795-804, issn 0165-1250Article

Design studies for tunnels for Hong Kong's new airport railwayMCKAY, H; GIBSON, M; HIBBERT, G et al.Developments in geotechnical engineering. 1993, Vol 74, pp 53-64, issn 0165-1250Article

Underground station Wilhelminapier, RotterdamFEIJEN, T. A; HANNINK, G.Developments in geotechnical engineering. 1993, Vol 74, pp 231-240, issn 0165-1250Article

The Fort Point Channel tunnel of the Boston Central Artery ProjectGRANTZ, W. C; EASTES, P. M.Developments in geotechnical engineering. 1993, Vol 74, pp 257-266, issn 0165-1250Article

Österleden, Stockholm: the Saltsjön crossing, comparative studies of two alternative solutionsHESTNER, K; OLSSON, P.Developments in geotechnical engineering. 1993, Vol 74, pp 303-312, issn 0165-1250Article

Design & construction of the London Water Ring mainREMINGTON, R; SMITH, A.Developments in geotechnical engineering. 1993, Vol 74, pp 363-375, issn 0165-1250Article

Empirical analysis of minimum rock cover for subsea rock tunnelsNILSEN, B.Developments in geotechnical engineering. 1993, Vol 74, pp 677-687, issn 0165-1250Article

Hydraulic tunnel excavation by TBM in schist: the effect of rock variability, as monitored by the machine control instrumentsINNAURATO, N; MANCINI, R; RONDENA, E et al.Developments in geotechnical engineering. 1993, Vol 74, pp 539-546, issn 0165-1250Article

Infrastructure tunnels procured by private financeMERNA, A; SMIT, N. J.Developments in geotechnical engineering. 1993, Vol 74, pp 895-905, issn 0165-1250Article

Wijker Tunnel: environmental impact of dewatering of the approachesTAN, G. L; SCHOUTEN, C. P.Developments in geotechnical engineering. 1993, Vol 74, pp 281-290, issn 0165-1250Article

  • Page / 2726