Pascal and Francis Bibliographic Databases

Help

Search results

Your search

ct.\*:(%22Scheduling%2C sequencing%22)

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 7761

  • Page / 311
Export

Selection :

  • and

Single machine scheduling problem with interval processing times to minimize mean weighted completion timeALLAHVERDI, Ali; AYDILEK, Harun; AYDILEK, Asiye et al.Computers & operations research. 2014, Vol 51, pp 200-207, issn 0305-0548, 8 p.Article

A new hybrid genetic algorithm for job shop scheduling problemQING-DAO-ER-JI, Ren; YUPING WANG.Computers & operations research. 2012, Vol 39, Num 10, pp 2291-2299, issn 0305-0548, 9 p.Article

A two-layer dynamic scheduling method for minimising the earliness and tardiness of a re-entrant production lineYING YAN; ZHENG WANG.International journal of production research. 2012, Vol 50, Num 2-4, pp 499-515, issn 0020-7543, 17 p.Article

Scheduling identical wafer sorting parallel machines with sequence-dependent setup times using an iterated greedy heuristicYING, Kuo-Ching.International journal of production research. 2012, Vol 50, Num 10-12, pp 2710-2719, issn 0020-7543, 10 p.Article

The Interleaved Constructive Memetic Algorithm and its application to timetablingÖZCAN, Ender; PARKES, Andrew J; ALKAN, Alpay et al.Computers & operations research. 2012, Vol 39, Num 10, pp 2310-2322, issn 0305-0548, 13 p.Article

Minimizing total weighted flow time under uncertainty using dominance and a stability boxSOTSKOV, Yu. N; LAI, T.-C.Computers & operations research. 2012, Vol 39, Num 6, pp 1271-1289, issn 0305-0548, 19 p.Article

A Neurogenetic approach for the resource-constrained project scheduling problem : Project management and schedulingAGARWAL, Anurag; COLAK, Selcuk; ERENGUC, Selcuk et al.Computers & operations research. 2011, Vol 38, Num 1, pp 44-50, issn 0305-0548, 7 p.Article

A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations : Project management and schedulingBIANCO, Lucio; CARAMIA, Massimiliano.Computers & operations research. 2011, Vol 38, Num 1, pp 14-20, issn 0305-0548, 7 p.Article

A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehiclesNISHI, Tatsushi; HIRANAKA, Yuichiro; GROSSMANN, Ignacio E et al.Computers & operations research. 2011, Vol 38, Num 5, pp 876-888, issn 0305-0548, 13 p.Article

A heuristic approach for resource constrained project scheduling with uncertain activity durationsBRUNI, M. E; BERALDI, P; GUERRIERO, F et al.Computers & operations research. 2011, Vol 38, Num 9, pp 1305-1318, issn 0305-0548, 14 p.Article

A heuristic method for RCPSP with fuzzy activity timesBHASKAR, Tarun; PAL, Manabendra N; PAL, Asim K et al.European journal of operational research. 2011, Vol 208, Num 1, pp 57-66, issn 0377-2217, 10 p.Article

A hybrid single and dual population search procedure for the job shop scheduling problemSELS, Veronique; CRAEYMEERSCH, Kjeld; VANHOUCKE, Mario et al.European journal of operational research. 2011, Vol 215, Num 3, pp 512-523, issn 0377-2217, 12 p.Article

A model for timetabling problems with period spread constraintsLARA-VELAZQUEZ, P; LOPEZ-BRACHO, R; RAMIREZ-RODRIGUEZ, J et al.The Journal of the Operational Research Society. 2011, Vol 62, Num 1, pp 217-222, issn 0160-5682, 6 p.Article

A note on the modelling of project networks with time constraintsCARAMIA, Massimiliano; GUERRIERO, Francesca.European journal of operational research. 2011, Vol 211, Num 3, pp 666-670, issn 0377-2217, 5 p.Article

Assigning judges to competitions of several rounds using Tabu searchLAMGHARI, Amina; FERLAND, Jacques A.European journal of operational research. 2011, Vol 210, Num 3, pp 694-705, issn 0377-2217, 12 p.Article

Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release datesLIN, Shih-Wei; LEE, Zne-Jung; YING, Kuo-Ching et al.Computers & operations research. 2011, Vol 38, Num 5, pp 809-815, issn 0305-0548, 7 p.Article

Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup timeNEKOIEMEHR, N; MOSLEHI, G.The Journal of the Operational Research Society. 2011, Vol 62, Num 7, pp 1403-1412, issn 0160-5682, 10 p.Article

Resource constraint scheduling with a fractional shared resourceSINGH, Gaurav; ERNST, Andreas T.Operations research letters. 2011, Vol 39, Num 5, pp 363-368, issn 0167-6377, 6 p.Article

Scheduling jobs with chain precedence constraints and deteriorating jobsWANG, J.-B; WANG, J.-J; JI, P et al.The Journal of the Operational Research Society. 2011, Vol 62, Num 9, pp 1765-1770, issn 0160-5682, 6 p.Article

A combinatorial property of the maximum round robin tournament problemHORBACH, Andrei.Operations research letters. 2010, Vol 38, Num 2, pp 121-122, issn 0167-6377, 2 p.Article

An optimal online algorithm for single machine scheduling with bounded delivery timesMING LIU; CHENGBIN CHU; YINFENG XU et al.European journal of operational research. 2010, Vol 201, Num 3, pp 693-700, issn 0377-2217, 8 p.Article

Completion time variance minimization in single machine and multi-machine systemsSRIRANGACHARYULU, B; SRINIVASAN, G.Computers & operations research. 2010, Vol 37, Num 1, pp 62-71, issn 0305-0548, 10 p.Article

Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspectiveRIBAS, Imma; LEISTEN, Rainer; FRAMINAN, Jose M et al.Computers & operations research. 2010, Vol 37, Num 8, pp 1439-1454, issn 0305-0548, 16 p.Article

Transferring progress control policies in scheduling problems for a class of repetitive discrete event systemsGOTO, Hiroyuki; TAKAHASHI, Hirotaka.International journal of control. 2010, Vol 83, Num 2, pp 421-431, issn 0020-7179, 11 p.Article

A heuristic to minimize total flow time in permutation flow shopLAHA, Dipak; SARIN, Subhash C.Omega (Oxford). 2009, Vol 37, Num 3, pp 734-739, issn 0305-0483, 6 p.Article

  • Page / 311